ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O — Prevailing Wage Rates

Davis-Bacon prevailing wages for ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING Os across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 63 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O is $51.25/hr, with the middle 80% of counties paying between $51.25 and $51.25/hr. The highest state average is Wisconsin at $51.25/hr; the lowest is Wisconsin at $51.25/hr.

Bottom 10%
$51.25
Median
$51.25
Average
$51.25
Top 10%
$51.25

Range: $51.25 – $51.25/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111Electricians.

Davis-Bacon median
$51.25/hr
National median total package (base + fringe)
BLS OEWS market median
$29.98/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+70.9%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Wisconsin WI
Avg base: $31.17/hr
Avg total: $51.25/hr
63 rates

All Rates

63 county-level rates for ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Adams WI building $31.17 $20.08 $51.25 WD →
Ashland WI building $31.17 $20.08 $51.25 WD →
Barron WI building $31.17 $20.08 $51.25 WD →
Bayfield WI building $31.17 $20.08 $51.25 WD →
Brown WI building $31.17 $20.08 $51.25 WD →
Buffalo WI building $31.17 $20.08 $51.25 WD →
Burnett WI building $31.17 $20.08 $51.25 WD →
Chippewa WI building $31.17 $20.08 $51.25 WD →
Clark WI building $31.17 $20.08 $51.25 WD →
Columbia WI building $31.17 $20.08 $51.25 WD →
Crawford WI building $31.17 $20.08 $51.25 WD →
Dane WI building $31.17 $20.08 $51.25 WD →
Dodge WI building $31.17 $20.08 $51.25 WD →
Door WI building $31.17 $20.08 $51.25 WD →
Douglas WI building $31.17 $20.08 $51.25 WD →
Dunn WI building $31.17 $20.08 $51.25 WD →
Eau Claire WI building $31.17 $20.08 $51.25 WD →
Florence WI building $31.17 $20.08 $51.25 WD →
Fond Du Lac WI building $31.17 $20.08 $51.25 WD →
Forest WI building $31.17 $20.08 $51.25 WD →
Grant WI building $31.17 $20.08 $51.25 WD →
Green WI building $31.17 $20.08 $51.25 WD →
Green Lake WI building $31.17 $20.08 $51.25 WD →
Iowa WI building $31.17 $20.08 $51.25 WD →
Iron WI building $31.17 $20.08 $51.25 WD →
Jackson WI building $31.17 $20.08 $51.25 WD →
Jefferson WI building $31.17 $20.08 $51.25 WD →
Juneau WI building $31.17 $20.08 $51.25 WD →
Kenosha WI building $31.17 $20.08 $51.25 WD →
Kewaunee WI building $31.17 $20.08 $51.25 WD →
La Crosse WI building $31.17 $20.08 $51.25 WD →
Lafayette WI building $31.17 $20.08 $51.25 WD →
Langlade WI building $31.17 $20.08 $51.25 WD →
Lincoln WI building $31.17 $20.08 $51.25 WD →
Manitowoc WI building $31.17 $20.08 $51.25 WD →
Marinette WI building $31.17 $20.08 $51.25 WD →
Marquette WI building $31.17 $20.08 $51.25 WD →
Menominee WI building $31.17 $20.08 $51.25 WD →
Monroe WI building $31.17 $20.08 $51.25 WD →
Oconto WI building $31.17 $20.08 $51.25 WD →
Oneida WI building $31.17 $20.08 $51.25 WD →
Pepin WI building $31.17 $20.08 $51.25 WD →
Pierce WI building $31.17 $20.08 $51.25 WD →
Polk WI building $31.17 $20.08 $51.25 WD →
Portage WI building $31.17 $20.08 $51.25 WD →
Price WI building $31.17 $20.08 $51.25 WD →
Racine WI building $31.17 $20.08 $51.25 WD →
Richland WI building $31.17 $20.08 $51.25 WD →
Rock WI building $31.17 $20.08 $51.25 WD →
Rusk WI building $31.17 $20.08 $51.25 WD →
Sauk WI building $31.17 $20.08 $51.25 WD →
Sawyer WI building $31.17 $20.08 $51.25 WD →
Shawano WI building $31.17 $20.08 $51.25 WD →
St Croix WI building $31.17 $20.08 $51.25 WD →
Taylor WI building $31.17 $20.08 $51.25 WD →
Trempealeau WI building $31.17 $20.08 $51.25 WD →
Vernon WI building $31.17 $20.08 $51.25 WD →
Vilas WI building $31.17 $20.08 $51.25 WD →
Walworth WI building $31.17 $20.08 $51.25 WD →
Washburn WI building $31.17 $20.08 $51.25 WD →
Waupaca WI building $31.17 $20.08 $51.25 WD →
Waushara WI building $31.17 $20.08 $51.25 WD →
Wood WI building $31.17 $20.08 $51.25 WD →
Top-paying counties for ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O →