ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECO — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECOs across all covered states and counties. Rates vary by location and construction type.
Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECO is $45.66/hr, with the middle 80% of counties paying between $45.66 and $45.66/hr. The highest state average is New York at $45.66/hr; the lowest is New York at $45.66/hr.
Range: $45.66 – $45.66/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
6 county-level rates for ELECTRICIAN LINE CONSTRUCTION INSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECO, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Broome | NY | building | $38.73 | $6.93 | $45.66 | WD → |
| Broome | NY | heavy | $38.73 | $6.93 | $45.66 | WD → |
| Broome | NY | highway | $38.73 | $6.93 | $45.66 | WD → |
| Chenango | NY | building | $38.73 | $6.93 | $45.66 | WD → |
| Chenango | NY | heavy | $38.73 | $6.93 | $45.66 | WD → |
| Chenango | NY | highway | $38.73 | $6.93 | $45.66 | WD → |