ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTIONs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION is $75.23/hr, with the middle 80% of counties paying between $75.23 and $75.23/hr. The highest state average is Indiana at $75.23/hr; the lowest is Indiana at $75.23/hr.
Range: $75.23 – $75.23/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for ELECTRICIAN: INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION AND RECEPTION, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $46.00 | $29.23 | $75.23 | WD → |
| La Porte | IN | highway | $46.00 | $29.23 | $75.23 | WD → |
| La Porte | IN | heavy | $46.00 | $29.23 | $75.23 | WD → |
| Lake | IN | heavy | $46.00 | $29.23 | $75.23 | WD → |
| Lake | IN | building | $46.00 | $29.23 | $75.23 | WD → |
| Lake | IN | highway | $46.00 | $29.23 | $75.23 | WD → |
| Porter | IN | heavy | $46.00 | $29.23 | $75.23 | WD → |
| Porter | IN | building | $46.00 | $29.23 | $75.23 | WD → |
| Porter | IN | highway | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | heavy | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | building | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | building | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | highway | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | highway | $46.00 | $29.23 | $75.23 | WD → |
| St Joseph | IN | heavy | $46.00 | $29.23 | $75.23 | WD → |