ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS — Prevailing Wage Rates
Davis-Bacon prevailing wages for ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTSs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS is $80.85/hr, with the middle 80% of counties paying between $80.85 and $80.85/hr. The highest state average is Rhode Island at $80.85/hr; the lowest is Rhode Island at $80.85/hr.
Range: $80.85 – $80.85/hr across 1 state. Total package = base hourly rate + fringe benefits.
Davis-Bacon vs. Market Median
Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2111 — Electricians.
Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.
Average Rates by State
All Rates
15 county-level rates for ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED LIFTS, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Bristol | RI | building | $56.11 | $24.74 | $80.85 | WD → |
| Bristol | RI | heavy | $56.11 | $24.74 | $80.85 | WD → |
| Bristol | RI | highway | $56.11 | $24.74 | $80.85 | WD → |
| Kent | RI | building | $56.11 | $24.74 | $80.85 | WD → |
| Kent | RI | highway | $56.11 | $24.74 | $80.85 | WD → |
| Kent | RI | heavy | $56.11 | $24.74 | $80.85 | WD → |
| Newport | RI | heavy | $56.11 | $24.74 | $80.85 | WD → |
| Newport | RI | building | $56.11 | $24.74 | $80.85 | WD → |
| Newport | RI | highway | $56.11 | $24.74 | $80.85 | WD → |
| Providence | RI | building | $56.11 | $24.74 | $80.85 | WD → |
| Providence | RI | heavy | $56.11 | $24.74 | $80.85 | WD → |
| Providence | RI | highway | $56.11 | $24.74 | $80.85 | WD → |
| Washington | RI | highway | $56.11 | $24.74 | $80.85 | WD → |
| Washington | RI | heavy | $56.11 | $24.74 | $80.85 | WD → |
| Washington | RI | building | $56.11 | $24.74 | $80.85 | WD → |