COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE — Prevailing Wage Rates

Davis-Bacon prevailing wages for COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 40 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE is $113.45/hr, with the middle 80% of counties paying between $113.45 and $113.45/hr. The highest state average is Illinois at $113.45/hr; the lowest is Illinois at $113.45/hr.

Bottom 10%
$113.45
Median
$113.45
Average
$113.45
Top 10%
$113.45

Range: $113.45 – $113.45/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Illinois IL
Avg base: $62.45/hr
Avg total: $113.45/hr
40 rates

All Rates

40 county-level rates for COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Bureau IL highway $62.45 $51.00 $113.45 WD →
Bureau IL heavy $62.45 $51.00 $113.45 WD →
Carroll IL heavy $62.45 $51.00 $113.45 WD →
Carroll IL highway $62.45 $51.00 $113.45 WD →
Ford IL heavy $62.45 $51.00 $113.45 WD →
Ford IL highway $62.45 $51.00 $113.45 WD →
Grundy IL highway $62.45 $51.00 $113.45 WD →
Grundy IL heavy $62.45 $51.00 $113.45 WD →
Henry IL heavy $62.45 $51.00 $113.45 WD →
Henry IL highway $62.45 $51.00 $113.45 WD →
Iroquois IL highway $62.45 $51.00 $113.45 WD →
Iroquois IL heavy $62.45 $51.00 $113.45 WD →
Jo Daviess IL heavy $62.45 $51.00 $113.45 WD →
Jo Daviess IL highway $62.45 $51.00 $113.45 WD →
Kankakee IL heavy $62.45 $51.00 $113.45 WD →
Kankakee IL highway $62.45 $51.00 $113.45 WD →
La Salle IL highway $62.45 $51.00 $113.45 WD →
La Salle IL heavy $62.45 $51.00 $113.45 WD →
Lee IL highway $62.45 $51.00 $113.45 WD →
Lee IL heavy $62.45 $51.00 $113.45 WD →
Livingston IL heavy $62.45 $51.00 $113.45 WD →
Livingston IL highway $62.45 $51.00 $113.45 WD →
Marshall IL heavy $62.45 $51.00 $113.45 WD →
Marshall IL highway $62.45 $51.00 $113.45 WD →
McLean IL highway $62.45 $51.00 $113.45 WD →
McLean IL heavy $62.45 $51.00 $113.45 WD →
Ogle IL highway $62.45 $51.00 $113.45 WD →
Ogle IL heavy $62.45 $51.00 $113.45 WD →
Putnam IL heavy $62.45 $51.00 $113.45 WD →
Putnam IL highway $62.45 $51.00 $113.45 WD →
Rock Island IL heavy $62.45 $51.00 $113.45 WD →
Rock Island IL highway $62.45 $51.00 $113.45 WD →
Stephenson IL highway $62.45 $51.00 $113.45 WD →
Stephenson IL heavy $62.45 $51.00 $113.45 WD →
Whiteside IL heavy $62.45 $51.00 $113.45 WD →
Whiteside IL highway $62.45 $51.00 $113.45 WD →
Winnebago IL heavy $62.45 $51.00 $113.45 WD →
Winnebago IL highway $62.45 $51.00 $113.45 WD →
Woodford IL highway $62.45 $51.00 $113.45 WD →
Woodford IL heavy $62.45 $51.00 $113.45 WD →
Top-paying counties for COMPRESSOR AND THROTTLE VALVE; COMPRESSOR, COMMON RECEIVER; CONCRETE BREAKER OR HYDRO HAMMER; CONCRETE GRINDING MACHINE; CONCRETE MIXER OR PAVER 7S SE →