COMMUNICATIONS SYSTEM, SOUND WIREMAN (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FAC — Prevailing Wage Rates

Davis-Bacon prevailing wages for COMMUNICATIONS SYSTEM, SOUND WIREMAN (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMMUNICATIONS SYSTEM, SOUND WIREMAN (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FAC is $80.55/hr, with the middle 80% of counties paying between $80.55 and $80.55/hr. The highest state average is New York at $80.55/hr; the lowest is New York at $80.55/hr.

Bottom 10%
$80.55
Median
$80.55
Average
$80.55
Top 10%
$80.55

Range: $80.55 – $80.55/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

New York NY
Avg base: $44.50/hr
Avg total: $80.55/hr
9 rates

All Rates

9 county-level rates for COMMUNICATIONS SYSTEM, SOUND WIREMAN (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FAC, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Allegany NY heavy $44.50 $36.05 $80.55 WD →
Cattaraugus NY heavy $44.50 $36.05 $80.55 WD →
Cortland NY heavy $44.50 $36.05 $80.55 WD →
Schuyler NY heavy $44.50 $36.05 $80.55 WD →
Seneca NY heavy $44.50 $36.05 $80.55 WD →
Steuben NY heavy $44.50 $36.05 $80.55 WD →
Tompkins NY heavy $44.50 $36.05 $80.55 WD →
Wyoming NY heavy $44.50 $36.05 $80.55 WD →
Yates NY heavy $44.50 $36.05 $80.55 WD →
Top-paying counties for COMMUNICATIONS SYSTEM, SOUND WIREMAN (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FAC →