COMMUNICATIONS SYSTEM (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDI — Prevailing Wage Rates
Davis-Bacon prevailing wages for COMMUNICATIONS SYSTEM (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDIs across all covered states and counties. Rates vary by location and construction type.
Across 9 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMMUNICATIONS SYSTEM (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDI is $28.22/hr, with the middle 80% of counties paying between $28.22 and $28.22/hr. The highest state average is New York at $28.22/hr; the lowest is New York at $28.22/hr.
Range: $28.22 – $28.22/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
9 county-level rates for COMMUNICATIONS SYSTEM (CATTARAUGUS WYOMING WORK COVERS LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE, AND REMOVAL OF TELEDATA FACILITIES INCLUDI, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Allegany | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Cattaraugus | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Cortland | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Schuyler | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Seneca | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Steuben | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Tompkins | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Wyoming | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |
| Yates | NY | heavy | $14.20 | $14.02 | $28.22 | WD → |