COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION — Prevailing Wage Rates
Davis-Bacon prevailing wages for COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSIONs across all covered states and counties. Rates vary by location and construction type.
Across 15 Davis-Bacon rate records nationwide, the median total package (base + fringe) for COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION is $44.83/hr, with the middle 80% of counties paying between $44.83 and $44.83/hr. The highest state average is Indiana at $44.83/hr; the lowest is Indiana at $44.83/hr.
Range: $44.83 – $44.83/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
15 county-level rates for COMMUNICATION TECHNICIAN- INCLUDES THE INSTALLATION, OPERATION, INSPECTION, MODIFICATION, MAINTENANCE AND REPAIR OF SYSTEMS USED FOR THE TRANSMISSION, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| La Porte | IN | building | $26.50 | $18.33 | $44.83 | WD → |
| La Porte | IN | highway | $26.50 | $18.33 | $44.83 | WD → |
| La Porte | IN | heavy | $26.50 | $18.33 | $44.83 | WD → |
| Lake | IN | heavy | $26.50 | $18.33 | $44.83 | WD → |
| Lake | IN | building | $26.50 | $18.33 | $44.83 | WD → |
| Lake | IN | highway | $26.50 | $18.33 | $44.83 | WD → |
| Porter | IN | heavy | $26.50 | $18.33 | $44.83 | WD → |
| Porter | IN | building | $26.50 | $18.33 | $44.83 | WD → |
| Porter | IN | highway | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | heavy | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | building | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | building | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | highway | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | highway | $26.50 | $18.33 | $44.83 | WD → |
| St Joseph | IN | heavy | $26.50 | $18.33 | $44.83 | WD → |