CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION — Prevailing Wage Rates

Davis-Bacon prevailing wages for CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATIONs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 28 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION is $14.30/hr, with the middle 80% of counties paying between $14.30 and $14.30/hr. The highest state average is Texas at $14.43/hr; the lowest is Texas at $14.43/hr.

Bottom 10%
$14.30
Median
$14.30
Average
$14.43
Top 10%
$14.30

Range: $13.40 – $18.03/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031Carpenters.

Davis-Bacon median
$14.30/hr
National median total package (base + fringe)
BLS OEWS market median
$28.51/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
-49.8%
D-B rate is below market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Texas TX
Avg base: $14.41/hr
Avg total: $14.43/hr
28 rates

All Rates

28 county-level rates for CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Bosque TX building $14.30 $0.00 $14.30 WD →
Camp TX building $14.30 $0.00 $14.30 WD →
Cass TX building $14.30 $0.00 $14.30 WD →
Cherokee TX building $14.30 $0.00 $14.30 WD →
Cooke TX building $14.30 $0.00 $14.30 WD →
Erath TX building $14.30 $0.00 $14.30 WD →
Fannin TX building $13.40 $0.00 $13.40 WD →
Franklin TX building $14.30 $0.00 $14.30 WD →
Hamilton TX building $14.30 $0.00 $14.30 WD →
Harrison TX building $14.30 $0.00 $14.30 WD →
Henderson TX building $14.30 $0.00 $14.30 WD →
Hill TX building $14.30 $0.00 $14.30 WD →
Hood TX building $14.30 $0.00 $14.30 WD →
Hopkins TX building $14.30 $0.00 $14.30 WD →
Lamar TX building $14.30 $0.00 $14.30 WD →
Marion TX building $14.30 $0.00 $14.30 WD →
Montague TX building $15.00 $0.00 $15.00 WD →
Morris TX building $14.30 $0.00 $14.30 WD →
Nacogdoches TX building $17.50 $0.53 $18.03 WD →
Navarro TX building $14.30 $0.00 $14.30 WD →
Palo Pinto TX building $14.30 $0.00 $14.30 WD →
Panola TX building $14.30 $0.00 $14.30 WD →
Rains TX building $14.30 $0.00 $14.30 WD →
Red River TX building $14.30 $0.00 $14.30 WD →
Somervell TX building $14.30 $0.00 $14.30 WD →
Titus TX building $14.30 $0.00 $14.30 WD →
Van Zandt TX building $14.30 $0.00 $14.30 WD →
Wood TX building $14.30 $0.00 $14.30 WD →
Top-paying counties for CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND HARDWOOD FLOOR INSTALLATION →