CARPENTER: FORMWORK CONCRETE — Prevailing Wage Rates

Davis-Bacon prevailing wages for CARPENTER: FORMWORK CONCRETEs across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 29 Davis-Bacon rate records nationwide, the median total package (base + fringe) for CARPENTER: FORMWORK CONCRETE is $41.24/hr, with the middle 80% of counties paying between $38.74 and $43.87/hr. The highest state average is Arizona at $41.36/hr; the lowest is Arizona at $41.36/hr.

Bottom 10%
$38.74
Median
$41.24
Average
$41.36
Top 10%
$43.87

Range: $36.43 – $45.67/hr across 1 state. Total package = base hourly rate + fringe benefits.

Davis-Bacon vs. Market Median

Comparison of the Davis-Bacon national median total package against the BLS Occupational Employment and Wage Statistics (OEWS) median for the comparable BLS occupation 47-2031Carpenters.

Davis-Bacon median
$41.24/hr
National median total package (base + fringe)
BLS OEWS market median
$28.51/hr
All-industry hourly median, U.S. (2024)
Davis-Bacon premium
+44.7%
D-B rate exceeds market median

Davis-Bacon rates include required fringe benefits; OEWS reflects mean/median wages from the BLS establishment survey across all industries. Direct comparison is approximate — D-B rates target the construction-industry union/competitive-wage benchmark, while OEWS spans every industry that employs the occupation.

Average Rates by State

Arizona AZ
Avg base: $31.85/hr
Avg total: $41.36/hr
29 rates

All Rates

29 county-level rates for CARPENTER: FORMWORK CONCRETE, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Apache AZ heavy $31.98 $9.26 $41.24 WD →
Apache AZ highway $33.16 $10.71 $43.87 WD →
Cochise AZ highway $29.34 $7.09 $36.43 WD →
Cochise AZ heavy $31.98 $9.26 $41.24 WD →
Coconino AZ highway $31.98 $9.26 $41.24 WD →
Coconino AZ heavy $31.98 $9.26 $41.24 WD →
Gila AZ heavy $31.98 $9.26 $41.24 WD →
Gila AZ highway $33.16 $10.71 $43.87 WD →
Graham AZ highway $33.16 $10.71 $43.87 WD →
Graham AZ heavy $31.98 $9.26 $41.24 WD →
Greenlee AZ highway $33.16 $10.71 $43.87 WD →
Greenlee AZ heavy $31.98 $9.26 $41.24 WD →
La Paz AZ heavy $31.98 $9.26 $41.24 WD →
La Paz AZ highway $33.55 $12.12 $45.67 WD →
Maricopa AZ heavy $31.98 $9.26 $41.24 WD →
Maricopa AZ highway $29.86 $8.89 $38.75 WD →
Mohave AZ heavy $31.98 $9.26 $41.24 WD →
Mohave AZ highway $31.98 $9.26 $41.24 WD →
Navajo AZ highway $33.16 $10.71 $43.87 WD →
Navajo AZ heavy $31.98 $9.26 $41.24 WD →
Pima AZ highway $29.73 $10.78 $40.51 WD →
Pima AZ heavy $31.98 $9.26 $41.24 WD →
Pinal AZ highway $29.84 $8.85 $38.69 WD →
Pinal AZ heavy $31.98 $9.26 $41.24 WD →
Santa Cruz AZ highway $32.51 $10.13 $42.64 WD →
Santa Cruz AZ heavy $31.98 $9.26 $41.24 WD →
Yavapai AZ heavy $31.98 $9.26 $41.24 WD →
Yuma AZ highway $29.34 $7.09 $36.43 WD →
Yuma AZ heavy $31.98 $9.26 $41.24 WD →
Top-paying counties for CARPENTER: FORMWORK CONCRETE →