BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLU — Prevailing Wage Rates
Davis-Bacon prevailing wages for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLUs across all covered states and counties. Rates vary by location and construction type.
Across 6 Davis-Bacon rate records nationwide, the median total package (base + fringe) for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLU is $72.30/hr, with the middle 80% of counties paying between $72.30 and $72.30/hr. The highest state average is New York at $72.30/hr; the lowest is New York at $72.30/hr.
Range: $72.30 – $72.30/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
6 county-level rates for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN INCLU, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Broome | NY | building | $41.90 | $30.40 | $72.30 | WD → |
| Broome | NY | heavy | $41.90 | $30.40 | $72.30 | WD → |
| Broome | NY | highway | $41.90 | $30.40 | $72.30 | WD → |
| Chenango | NY | building | $41.90 | $30.40 | $72.30 | WD → |
| Chenango | NY | heavy | $41.90 | $30.40 | $72.30 | WD → |
| Chenango | NY | highway | $41.90 | $30.40 | $72.30 | WD → |