BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCL — Prevailing Wage Rates
Davis-Bacon prevailing wages for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCLs across all covered states and counties. Rates vary by location and construction type.
Across 2 Davis-Bacon rate records nationwide, the median total package (base + fringe) for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCL is $81.85/hr, with the middle 80% of counties paying between $81.85 and $81.85/hr. The highest state average is New York at $81.85/hr; the lowest is New York at $81.85/hr.
Range: $81.85 – $81.85/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
2 county-level rates for BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCL, ordered by state and county.