AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I — Prevailing Wage Rates

Davis-Bacon prevailing wages for AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED Is across all covered states and counties. Rates vary by location and construction type.

Quick Answer

Across 72 Davis-Bacon rate records nationwide, the median total package (base + fringe) for AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I is $79.64/hr, with the middle 80% of counties paying between $79.64 and $79.64/hr. The highest state average is Alaska at $79.64/hr; the lowest is Alaska at $79.64/hr.

Bottom 10%
$79.64
Median
$79.64
Average
$79.64
Top 10%
$79.64

Range: $79.64 – $79.64/hr across 1 state. Total package = base hourly rate + fringe benefits.

Average Rates by State

Alaska AK
Avg base: $45.38/hr
Avg total: $79.64/hr
72 rates

All Rates

72 county-level rates for AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I, ordered by state and county.

County State Type Base $/hr Fringe $/hr Total
Aleutians West AK residential $45.38 $34.26 $79.64 WD →
Aleutians West AK heavy $45.38 $34.26 $79.64 WD →
Aleutians West AK building $45.38 $34.26 $79.64 WD →
Anchorage AK heavy $45.38 $34.26 $79.64 WD →
Anchorage AK building $45.38 $34.26 $79.64 WD →
Bethel AK heavy $45.38 $34.26 $79.64 WD →
Bethel AK building $45.38 $34.26 $79.64 WD →
Bethel AK residential $45.38 $34.26 $79.64 WD →
Bristol Bay AK building $45.38 $34.26 $79.64 WD →
Bristol Bay AK heavy $45.38 $34.26 $79.64 WD →
Bristol Bay AK residential $45.38 $34.26 $79.64 WD →
Denali AK heavy $45.38 $34.26 $79.64 WD →
Denali AK building $45.38 $34.26 $79.64 WD →
Dillingham AK building $45.38 $34.26 $79.64 WD →
Dillingham AK heavy $45.38 $34.26 $79.64 WD →
Dillingham AK residential $45.38 $34.26 $79.64 WD →
Fairbanks North Star AK heavy $45.38 $34.26 $79.64 WD →
Fairbanks North Star AK building $45.38 $34.26 $79.64 WD →
Haines AK residential $45.38 $34.26 $79.64 WD →
Haines AK heavy $45.38 $34.26 $79.64 WD →
Haines AK building $45.38 $34.26 $79.64 WD →
Juneau AK residential $45.38 $34.26 $79.64 WD →
Juneau AK building $45.38 $34.26 $79.64 WD →
Juneau AK heavy $45.38 $34.26 $79.64 WD →
Kenai Peninsula AK residential $45.38 $34.26 $79.64 WD →
Kenai Peninsula AK heavy $45.38 $34.26 $79.64 WD →
Kenai Peninsula AK building $45.38 $34.26 $79.64 WD →
Ketchikan Gateway AK residential $45.38 $34.26 $79.64 WD →
Ketchikan Gateway AK building $45.38 $34.26 $79.64 WD →
Ketchikan Gateway AK heavy $45.38 $34.26 $79.64 WD →
Kodiak Island AK residential $45.38 $34.26 $79.64 WD →
Kodiak Island AK building $45.38 $34.26 $79.64 WD →
Kodiak Island AK heavy $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK building $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK building $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK residential $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK heavy $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK residential $45.38 $34.26 $79.64 WD →
Matanuska-Susitna AK heavy $45.38 $34.26 $79.64 WD →
Nome AK building $45.38 $34.26 $79.64 WD →
Nome AK heavy $45.38 $34.26 $79.64 WD →
North Slope AK building $45.38 $34.26 $79.64 WD →
North Slope AK heavy $45.38 $34.26 $79.64 WD →
Northwest Artic AK building $45.38 $34.26 $79.64 WD →
Northwest Artic AK heavy $45.38 $34.26 $79.64 WD →
Peninsula & Lake AK building $45.38 $34.26 $79.64 WD →
Peninsula & Lake AK heavy $45.38 $34.26 $79.64 WD →
Peninsula & Lake AK residential $45.38 $34.26 $79.64 WD →
Prince Of Wales-Outer Ketchika AK heavy $45.38 $34.26 $79.64 WD →
Prince Of Wales-Outer Ketchika AK building $45.38 $34.26 $79.64 WD →
Prince Of Wales-Outer Ketchika AK residential $45.38 $34.26 $79.64 WD →
Sitka AK building $45.38 $34.26 $79.64 WD →
Sitka AK residential $45.38 $34.26 $79.64 WD →
Sitka AK heavy $45.38 $34.26 $79.64 WD →
Skagway-Yakutat-Angoon AK heavy $45.38 $34.26 $79.64 WD →
Skagway-Yakutat-Angoon AK residential $45.38 $34.26 $79.64 WD →
Skagway-Yakutat-Angoon AK building $45.38 $34.26 $79.64 WD →
Southeast Fairbanks AK heavy $45.38 $34.26 $79.64 WD →
Southeast Fairbanks AK building $45.38 $34.26 $79.64 WD →
Southeast Fairbanks AK building $45.38 $34.26 $79.64 WD →
Southeast Fairbanks AK heavy $45.38 $34.26 $79.64 WD →
Valdez-Cordova AK residential $45.38 $34.26 $79.64 WD →
Valdez-Cordova AK heavy $45.38 $34.26 $79.64 WD →
Valdez-Cordova AK building $45.38 $34.26 $79.64 WD →
Wade Hampton AK building $45.38 $34.26 $79.64 WD →
Wade Hampton AK heavy $45.38 $34.26 $79.64 WD →
Wade Hampton AK residential $45.38 $34.26 $79.64 WD →
Wrangell-Petersburg AK residential $45.38 $34.26 $79.64 WD →
Wrangell-Petersburg AK heavy $45.38 $34.26 $79.64 WD →
Wrangell-Petersburg AK building $45.38 $34.26 $79.64 WD →
Yukon-Koyukuk AK heavy $45.38 $34.26 $79.64 WD →
Yukon-Koyukuk AK building $45.38 $34.26 $79.64 WD →
Top-paying counties for AND RAISES) BURNING AND CUTTING TORCH; CEMENT OR LIME DUMPER OR HANDLER; CHOKER SPLICER; CHUCKTENDER; CONCRETE LABORERS; CULVERT PIPE LABORER; CURED I →