ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL, MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, A — Prevailing Wage Rates
Davis-Bacon prevailing wages for ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL, MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, As across all covered states and counties. Rates vary by location and construction type.
Across 12 Davis-Bacon rate records nationwide, the median total package (base + fringe) for ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL, MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, A is $88.13/hr, with the middle 80% of counties paying between $88.13 and $88.13/hr. The highest state average is New York at $88.13/hr; the lowest is New York at $88.13/hr.
Range: $88.13 – $88.13/hr across 1 state. Total package = base hourly rate + fringe benefits.
Average Rates by State
All Rates
12 county-level rates for ALL CMI EQUIPMENT, FRONT-END RUBBER TIRE LOADER, TRACTOR-MOUNTED DRILL, MUCKING MACHINE, CONCRETE CENTRAL MIX PLANT, CONCRETE PUMP, BELCRETE SYSTEM, A, ordered by state and county.
| County | State | Type | Base $/hr | Fringe $/hr | Total | |
|---|---|---|---|---|---|---|
| Dutchess | NY | building | $54.93 | $33.20 | $88.13 | WD → |
| Dutchess | NY | highway | $54.93 | $33.20 | $88.13 | WD → |
| Dutchess | NY | heavy | $54.93 | $33.20 | $88.13 | WD → |
| Orange | NY | building | $54.93 | $33.20 | $88.13 | WD → |
| Orange | NY | highway | $54.93 | $33.20 | $88.13 | WD → |
| Orange | NY | heavy | $54.93 | $33.20 | $88.13 | WD → |
| Sullivan | NY | heavy | $54.93 | $33.20 | $88.13 | WD → |
| Sullivan | NY | building | $54.93 | $33.20 | $88.13 | WD → |
| Sullivan | NY | highway | $54.93 | $33.20 | $88.13 | WD → |
| Ulster | NY | building | $54.93 | $33.20 | $88.13 | WD → |
| Ulster | NY | highway | $54.93 | $33.20 | $88.13 | WD → |
| Ulster | NY | heavy | $54.93 | $33.20 | $88.13 | WD → |