Building Construction — Sweetwater, Wyoming

WD WY20260041-17526-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS REMOVAL, ABATEMENT AND DEMOLITION in Sweetwater, Wyoming (construction type: building) is $23.00/hr base + $0.00/hr fringe = $23.00/hr total package (WD WY20260041-17526-bld, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: WY20260041-17526-bld
Revision: 1
Construction Type: building
State: Wyoming (WY)
County: Sweetwater
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference WY20260041View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL, ABATEMENT AND DEMOLITION $23.00 $0.00 $23.00 Top 10% $0.00 $0.00 $0.00 $0.00
BLINDS/WINDOW-COVERING INSTALLER $11.96 $0.00 $11.96 Top 10% $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.42 $32.82 $71.24 +95% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYERS AND MASONS $32.87 $14.52 $47.39 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS AND JOINERS $29.05 $5.48 $34.53 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
CARPET, LINOLEUM AND RESILIENT TILE LAYERS $40.00 $0.00 $40.00 Top 10% +68% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASONS/PLASTERERS $28.00 $4.20 $32.20 Top 10% +20% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS $35.17 $14.33 $49.50 +40% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR CONSTRUCTORS $56.57 $41.83 $98.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
FIRE SPRINKLER INSTALLERS $35.69 $9.36 $45.05 Top 10% $0.00 $0.00 $0.00 $0.00
FIRE SYSTEM INSTALLERS $31.77 $7.05 $38.82 Top 10% $0.00 $0.00 $0.00 $0.00
GENERAL LABORERS: GROUP 1 AXMEN, HAND FALLER; BIN WALL INSTALLER; BITUMINOUS CURB BUILDER; BURNER; CAR OR TRUCK LOADER; CONCRETE SAW; CONCRETE VIBRATO $22.77 $2.68 $25.45 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIERS $24.62 $4.64 $29.26 Above median +19% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $33.68 $12.69 $46.37 +117% vs market $0.00 $0.00 $0.00 $0.00
LIMITED ELECTRICIANS $32.62 $6.43 $39.05 Top 10% $0.00 $0.00 $0.00 $0.00
MARBLE, TILE AND TERRAZZO SETTERS $36.00 $12.00 $48.00 Top 10% $0.00 $0.00 $0.00 $0.00
MECHANICAL, HEAT AND FROST INSULATION $25.50 $2.63 $28.13 Top 10% $0.00 $0.00 $0.00 $0.00
MILLWRIGHT MACHINERY WORKERS $40.19 $20.79 $60.98 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 1 A-FRAME TRUCK; AIR COMPRESSOR; ASPHALT PLANT FIREMAN/OILER; AUGER MACHINE; BRAKEMAN; BROOM OPERATOR; BUMP GRINDER OPERATO $30.68 $7.61 $38.29 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 2 ASPHALT PLANT OPERATOR; BACKHOE OPERATOR; CABLEWAY OPERATOR; CMI MACHINE & SIMILAR OPERATOR; COMPACTOR OPERATOR; CONCRETE $30.68 $7.61 $38.29 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 3 DOZER/PUSHCAT; DUAL DRUM MIXER; HYDRO CRANE; MOTOR PATROL-GENERAL; SCRAPER; SIDEBOOM CAT OPERATOR; RIGGER; PUGMILL EQUIPM $30.68 $7.61 $38.29 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 4 FINISHER DOZER OPERATOR; HYDRO CRANE; LOADER OPERATOR; PILEDRIVER; SHOVEL, DRAGLINE & CLAMSHELL $30.68 $7.61 $38.29 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 5 CARRY LIFT OPERATOR; CRANES; GRADE-ALL; INSTRUMENT MAN; LOADER OPERATOR; MOLE OPERATOR; MOTOR PATROL-FINISHER; PUMPCRETE $30.68 $7.61 $38.29 Top 10% +25% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 6 CRANES; FOUR DRUM HOIST; HEAVY DUTY REPAIRMAN, WELDER; HYDROCRANE; LOADER OPERATOR; SCRAPER OPERATOR, TANDEM $41.25 $9.91 $51.16 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
OPERATING ENGINEERS: GROUP 7 CRANES; SHOVELS, DRAGLINES, & CLAMSHELLS; WHEEL EXCAVATOR $41.25 $9.91 $51.16 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS AND ALLIED TRADES $27.12 $0.00 $27.12 Top 10% +23% vs market $0.00 $0.00 $0.00 $0.00
PLUMBERS AND PIPEFITTERS $36.94 $9.49 $46.43 Bottom 10% +57% vs market $0.00 $0.00 $0.00 $0.00
ROOFERS $22.77 $0.00 $22.77 Above median +23% vs market $0.00 $0.00 $0.00 $0.00
SEMI-SKILLED LABORERS: GROUP 2 ASPHALT RAKER & TAMPER; BRAKEMAN AND VIBRATOR MAN; GUNITE NOZZLEMAN; HIGH SCALAR; MUCKER & BULL GANG LABORER; SANDBLAST $25.40 $2.68 $28.08 Top 10% $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKERS $31.20 $6.59 $37.79 Top 10% $0.00 $0.00 $0.00 $0.00
SHEETROCK AND DRYWALL INSTALLERS $29.76 $5.16 $34.92 Top 10% $0.00 $0.00 $0.00 $0.00
TENDERS: GROUP 4 Tenders Blaster/Powderman; Carpenter tender; Cement mason tender; Chuck tender; Drill operators for blasting & grouting; Fork lift op $25.40 $3.99 $29.39 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 1 CEMENT TRUCK; DUMP TRUCK; FLAT RACK TRUCK; FLEX BOOM-SINGLE AXLE & TWIN SCREW; FORKLIFT OPERATOR; FUEL/GREASE TRUCK; GREASE/SER $25.96 $3.83 $29.79 Top 10% +3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: GROUP 2 CARDEX PERSON; CEMENT MIXER; DUMP TRUCK; DUMPSTER TYPE EQUIPMENT; EXPEDITOR; HIGHBOY, LOWBOY, FLOATS, SEMI-TRUCK; LEAD WAREHOUS $29.64 $9.22 $38.86 Top 10% +34% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sweetwater, WY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sweetwater

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WY20260041-17526-bld →