Building Construction — Hot Springs, Wyoming
WD WY20260041-17623-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS REMOVAL, ABATEMENT AND DEMOLITION in Hot Springs, Wyoming (construction type: building) is $23.00/hr base + $0.00/hr fringe = $23.00/hr total package (WD WY20260041-17623-bld, Rev. 1).
Scroll down for all 34 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS REMOVAL, ABATEMENT AND DEMOLITION | $23.00 | $0.00 | $23.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BLINDS/WINDOW-COVERING INSTALLER | $11.96 | $0.00 | $11.96 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $38.42 | $32.82 | $71.24 +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYERS AND MASONS | $32.87 | $14.52 | $47.39 Top 10% +69% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS AND JOINERS | $29.05 | $5.48 | $34.53 Top 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPET, LINOLEUM AND RESILIENT TILE LAYERS | $40.00 | $0.00 | $40.00 Top 10% +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASONS/PLASTERERS | $28.00 | $4.20 | $32.20 Top 10% +20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS | $35.17 | $14.33 | $49.50 +40% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR CONSTRUCTORS | $56.57 | $41.83 | $98.40 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE SPRINKLER INSTALLERS | $35.69 | $9.36 | $45.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FIRE SYSTEM INSTALLERS | $31.77 | $7.05 | $38.82 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GENERAL LABORERS: GROUP 1 AXMEN, HAND FALLER; BIN WALL INSTALLER; BITUMINOUS CURB BUILDER; BURNER; CAR OR TRUCK LOADER; CONCRETE SAW; CONCRETE VIBRATO | $22.77 | $2.68 | $25.45 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIERS | $24.62 | $4.64 | $29.26 Above median +19% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $33.68 | $12.69 | $46.37 +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LIMITED ELECTRICIANS | $32.62 | $6.43 | $39.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MARBLE, TILE AND TERRAZZO SETTERS | $36.00 | $12.00 | $48.00 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MECHANICAL, HEAT AND FROST INSULATION | $25.50 | $2.63 | $28.13 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT MACHINERY WORKERS | $40.19 | $20.79 | $60.98 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 1 A-FRAME TRUCK; AIR COMPRESSOR; ASPHALT PLANT FIREMAN/OILER; AUGER MACHINE; BRAKEMAN; BROOM OPERATOR; BUMP GRINDER OPERATO | $30.68 | $7.61 | $38.29 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 2 ASPHALT PLANT OPERATOR; BACKHOE OPERATOR; CABLEWAY OPERATOR; CMI MACHINE & SIMILAR OPERATOR; COMPACTOR OPERATOR; CONCRETE | $30.68 | $7.61 | $38.29 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 3 DOZER/PUSHCAT; DUAL DRUM MIXER; HYDRO CRANE; MOTOR PATROL-GENERAL; SCRAPER; SIDEBOOM CAT OPERATOR; RIGGER; PUGMILL EQUIPM | $30.68 | $7.61 | $38.29 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 4 FINISHER DOZER OPERATOR; HYDRO CRANE; LOADER OPERATOR; PILEDRIVER; SHOVEL, DRAGLINE & CLAMSHELL | $30.68 | $7.61 | $38.29 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 5 CARRY LIFT OPERATOR; CRANES; GRADE-ALL; INSTRUMENT MAN; LOADER OPERATOR; MOLE OPERATOR; MOTOR PATROL-FINISHER; PUMPCRETE | $30.68 | $7.61 | $38.29 Top 10% +25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 6 CRANES; FOUR DRUM HOIST; HEAVY DUTY REPAIRMAN, WELDER; HYDROCRANE; LOADER OPERATOR; SCRAPER OPERATOR, TANDEM | $41.25 | $9.91 | $51.16 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATING ENGINEERS: GROUP 7 CRANES; SHOVELS, DRAGLINES, & CLAMSHELLS; WHEEL EXCAVATOR | $41.25 | $9.91 | $51.16 Top 10% +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS AND ALLIED TRADES | $27.12 | $0.00 | $27.12 Top 10% +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBERS AND PIPEFITTERS | $36.94 | $9.49 | $46.43 Bottom 10% +57% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFERS | $22.77 | $0.00 | $22.77 Above median +23% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SEMI-SKILLED LABORERS: GROUP 2 ASPHALT RAKER & TAMPER; BRAKEMAN AND VIBRATOR MAN; GUNITE NOZZLEMAN; HIGH SCALAR; MUCKER & BULL GANG LABORER; SANDBLAST | $25.40 | $2.68 | $28.08 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEETMETAL WORKERS | $31.20 | $6.59 | $37.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEETROCK AND DRYWALL INSTALLERS | $29.76 | $5.16 | $34.92 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TENDERS: GROUP 4 Tenders Blaster/Powderman; Carpenter tender; Cement mason tender; Chuck tender; Drill operators for blasting & grouting; Fork lift op | $25.40 | $3.99 | $29.39 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 1 CEMENT TRUCK; DUMP TRUCK; FLAT RACK TRUCK; FLEX BOOM-SINGLE AXLE & TWIN SCREW; FORKLIFT OPERATOR; FUEL/GREASE TRUCK; GREASE/SER | $25.96 | $3.83 | $29.79 Top 10% +3% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: GROUP 2 CARDEX PERSON; CEMENT MIXER; DUMP TRUCK; DUMPSTER TYPE EQUIPMENT; EXPEDITOR; HIGHBOY, LOWBOY, FLOATS, SEMI-TRUCK; LEAD WAREHOUS | $29.64 | $9.22 | $38.86 Top 10% +34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Hot Springs, WY — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Hot Springs
Compliance Notes
- This wage determination applies to federal contracts for building construction in Hot Springs, Wyoming.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.