Building Construction — Sheboygan, Wisconsin

WD WI20260016-17034-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS ABATEMENT/HAZARDOUS WASTE. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER in Sheboygan, Wisconsin (construction type: building) is $36.65/hr base + $19.97/hr fringe = $56.62/hr total package (WD WI20260016-17034-bld, Rev. 1).

Scroll down for all 34 trade classifications covered by this determination.

WD Number: WI20260016-17034-bld
Revision: 1
Construction Type: building
State: Wisconsin (WI)
County: Sheboygan
Effective: May 17, 2026
Trades covered: 34
Official source: SAM.gov reference WI20260016View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS ABATEMENT/HAZARDOUS WASTE. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER $36.65 $19.97 $56.62 $0.00 $0.00 $0.00 $0.00
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $45.24 $30.56 $75.80 Above median $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT AND FROST INSULATOR $25.36 $8.37 $33.73 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.52 $34.63 $81.15 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.45 $27.41 $65.86 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION (CALUMET AND SHEBOYGAN COUNTIES) $41.43 $29.99 $71.42 +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK, DRYWALL HANGING & PILEDRIVERMAN; EXCLUDING BATT INSULATION (CALUMET, OUTAGAMIE, AND WINNEBAGO COUNTIES) $41.43 $29.99 $71.42 +146% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CALUMET & SHEBOYGAN COUNTIES) $45.20 $25.27 $70.47 +95% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (CALUMET, OUTAGAMIE, AND WINNEBAGO COUNTIES) $41.76 $23.65 $65.41 +81% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $42.41 $20.06 $62.47 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $41.60 $27.89 $69.49 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $43.13 $27.89 $71.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.20 $27.89 $73.09 $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.73 $27.89 $73.62 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $49.28 $27.89 $77.17 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $50.53 $27.89 $78.42 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, JULY 4TH, LABOR DAY, THANKSGIVING DAY & CHRISTMAS DAY $44.66 $33.67 $78.33 Bottom 10% +77% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER $37.05 $19.97 $57.02 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CONCRETE WORKER $16.34 $3.59 $19.93 Top 10% -20% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE $8.73 $4.90 $13.63 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.00 $28.85 $70.85 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $37.65 $21.17 $58.82 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER, INCLUDING HVAC WORK ( ALL OTHER WORK) $53.23 $23.40 $76.63 +103% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER, INCLUDING HVAC WORK ( SMALL BUILDINGS WHERE PLUMBING OR HEATING IS $50,000 OR LESS) $50.02 $23.29 $73.31 +94% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $18.01 $3.28 $21.29 -11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT WORK AND TECHNICIAN $45.07 $31.04 $76.11 +108% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC DUCT WORK AND TECHNICIAN $46.47 $31.33 $77.80 +113% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER (CALUMET AND SHEBOYGAN COUNTIES) $41.43 $29.99 $71.42 +143% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER (CALUMET, OUTAGAMIE, AND WINNEBAGO COUNTIES) $41.43 $29.99 $71.42 +143% vs market $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS $37.13 $21.58 $58.71 $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $51.68 $29.73 $81.41 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $13.89 $8.36 $22.25 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $39.72 $28.70 $68.42 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $39.57 $28.70 $68.27 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Sheboygan, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Sheboygan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WI20260016-17034-bld →