Building Construction — La Crosse, Wisconsin

WD WI20260003-17050-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER in La Crosse, Wisconsin (construction type: building) is $45.88/hr base + $38.15/hr fringe = $84.03/hr total package (WD WI20260003-17050-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: WI20260003-17050-bld
Revision: 1
Construction Type: building
State: Wisconsin (WI)
County: La Crosse
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference WI20260003View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $45.88 $38.15 $84.03 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT AND FROST INSULATOR $25.36 $8.37 $33.73 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.52 $34.63 $81.15 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER & TILE SETTER $40.09 $28.10 $68.19 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.25 $27.84 $65.09 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.29 $25.21 $69.50 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O $31.17 $20.08 $51.25 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MO $65.17 $38.44 $103.61 +275% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $41.60 $27.89 $69.49 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $43.13 $27.89 $71.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.20 $27.89 $73.09 $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.73 $27.89 $73.62 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $49.28 $27.89 $77.17 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $50.53 $27.89 $78.42 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.00 $32.66 $76.66 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE $37.70 $19.97 $57.67 +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER. NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE $36.65 $19.97 $56.62 +127% vs market $0.00 $0.00 $0.00 $0.00
LABORERS $16.34 $3.59 $19.93 -20% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE $8.73 $4.90 $13.63 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.00 $28.85 $70.85 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $22.99 $13.29 $36.28 Above median +51% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $39.75 $25.10 $64.85 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER $50.94 $25.98 $76.92 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $18.01 $3.28 $21.29 -11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $45.63 $29.02 $74.65 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $41.43 $29.99 $71.42 Above median +143% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $51.68 $29.73 $81.41 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $13.89 $8.33 $22.22 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $39.72 $28.70 $68.42 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the La Crosse, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in La Crosse

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WI20260003-17050-bld →