Building Construction — Dodge, Wisconsin
WD WI20260011-17059-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI in Dodge, Wisconsin (construction type: building) is $45.88/hr base + $38.15/hr fringe = $84.03/hr total package (WD WI20260011-17059-bld, Rev. 1).
Scroll down for all 112 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $45.88 | $38.15 | $84.03 +220% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COATINGS, COVERINGS, AND FINISHES TO ALL TYPES OF MECHANI | $55.34 | $34.03 | $89.37 Top 10% +240% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI | $49.17 | $23.83 | $73.00 Top 10% +178% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $46.52 | $34.63 | $81.15 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $44.71 | $28.90 | $73.61 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.17 | $28.66 | $69.83 Above median +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER & TILE SETTER | $40.09 | $28.10 | $68.19 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER & TILE SETTER | $39.36 | $28.83 | $68.19 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER & TILE SETTER | $40.34 | $29.49 | $69.83 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER & TILE SETTER | $39.50 | $28.69 | $68.19 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER & TILE SETTER | $48.60 | $29.31 | $77.91 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER | $40.14 | $29.67 | $69.81 Bottom 10% +84% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER | $41.17 | $28.66 | $69.83 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE SETTER | $38.45 | $27.41 | $65.86 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER, TILE SETTER | $48.60 | $29.31 | $77.91 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: BRICKLAYER,CEMENT MASON,TILE SETTER | $39.36 | $28.83 | $68.19 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER: CEMENT MASON/CONCRETE FINISHER | $46.01 | $29.31 | $75.32 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CABINET INSTALLER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER, INCLUDING DRYWALL HANGING, ACOUSTICAL WORK: PILEDRIVERMAN | $44.45 | $28.78 | $73.23 Top 10% +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (ADAMS, BAYFIELD, FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO, TAYLOR, VILAS, AND WOOD COUNTI | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (BARRON, BURNETT, CLARK, DUNN, POLK, RUSK, SAWYER, AND WASHBURN COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (DOOR, FLORENCE, KEWAUNEE, MARINETTE, MENOMINEE, OCONTO, AND SHAWANO COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC AND MANITOWOC COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC, GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% +146% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BURNETT AND POLK COUNTIES) | $48.54 | $28.84 | $77.38 Top 10% +166% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BAYFIELD COUNTY) | $40.79 | $27.90 | $68.69 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $40.50 | $28.90 | $69.40 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $37.25 | $27.84 | $65.09 Above median +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $43.27 | $25.69 | $68.96 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $47.22 | $31.90 | $79.12 Top 10% +159% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ADAMS, CLARK, FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE, MENOMINEE, ONEIDA, PORTAGE, SHAWANO, VILAS AND WOOD COUNTIES) | $40.19 | $22.90 | $63.09 Top 10% +75% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK, CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND | $44.29 | $25.21 | $69.50 Top 10% +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DODGE COUNTY, FOND DU LAC, AND MANITOWOC COUNTIES) | $45.20 | $25.27 | $70.47 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN (DODGE, GREEN, JEFFERSON, LAFAYETTE, AND WALWORTH COUNTIES) | $43.65 | $23.59 | $67.24 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 (FLORENCE COUNTY AND MARINETTE COUNTY) | $33.94 | $21.80 | $55.74 Top 10% +54% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $180,000 (FLORENCE COUNTY AND MARINETTE COUNTY) | $31.75 | $21.73 | $53.48 Top 10% +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: (COLUMBIA, DODGE, GREEN LAKE COUNTY, IOWA, MARQUETTE COUNTY, AND SAUK COUNTIES) | $48.55 | $25.91 | $74.46 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: (DOOR, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, MENOMINEE, SHAWANO COUNTIES) | $42.00 | $23.93 | $65.93 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O | $31.17 | $20.08 | $51.25 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR | $49.28 | $27.89 | $77.17 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| FENCE INSTALLERS | $15.00 | $2.37 | $17.37 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $20.21 | $1.86 | $22.07 -25% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HEAT AND FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL | $45.24 | $30.56 | $75.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $42.89 | $36.86 | $79.75 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT, GREENE, GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MAR | $44.00 | $32.66 | $76.66 Top 10% +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, OUTAGAMIE, SHAWANO AND WALWORTH COUNTIES) | $44.66 | $33.67 | $78.33 Top 10% +77% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER (GREEN AND WALWORTH COUNTIES) | $48.74 | $49.65 | $98.39 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL (ASHLAND & BAYFIELD COUNTIES) | $34.59 | $23.47 | $58.06 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL (BAYFIELD COUNTY) | $36.04 | $23.47 | $59.51 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) | $37.70 | $19.97 | $57.67 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL: ADAMS COUNTY | $37.05 | $19.97 | $57.02 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL: AREA 1 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A | $37.70 | $19.97 | $57.67 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL: AREA 2 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A | $37.05 | $19.97 | $57.02 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL: AREA 3 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A | $36.35 | $19.97 | $56.32 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL: REMAINING AREA | $37.70 | $19.97 | $57.67 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $36.65 | $19.97 | $56.62 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BUFFALO, CRAW | $36.65 | $19.97 | $56.62 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS | $36.65 | $19.97 | $56.62 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ASHLAND & BAYFIE | $35.59 | $23.47 | $59.06 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BAYFIELD COUNTY) | $37.04 | $23.47 | $60.51 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS, GENERAL | $37.05 | $19.97 | $57.02 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LANDSCAPE LABORER | $21.52 | $18.94 | $40.46 | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT (ADAMS, ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GRANT, GR | $42.00 | $28.85 | $70.85 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT (BAYFIELD COUNTY) | $41.90 | $29.51 | $71.41 Top 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT CRANES, TOWER CRANES WITH OR W/O ATTACHMENTS OVER 100 TONS; CRANES, TOWER CRANES WITH BOOM, LEADS AND OR JIB LENGTH 176 FT O | $50.53 | $27.89 | $78.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP | $41.60 | $27.89 | $69.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT HYDRAULIC CRANE, 10 TONS OR LESS. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTE | $45.20 | $27.89 | $73.09 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POWER EQUIPMENT TRAVELLING CRANE. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER | $45.73 | $27.89 | $73.62 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: (BRUSH & ROLLER) | $14.64 | $2.55 | $17.19 Top 10% -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: SPRAY | $13.72 | $2.25 | $15.97 Bottom 10% -34% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $41.43 | $29.99 | $71.42 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (ADAMS, BAYFIELD, FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO, TAYLOR, VILAS, AND WOOD COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (BARRON, BURNETT, CLARK, DUNN, POLK, RUSK, SAWYER, AND WASHBURN COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (DOOR, FLORENCE, KEWAUNEE, MARINETTE, MENOMINEE, OCONTO, AND SHAWANO COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (FOND DU LAC AND MANITOWOC COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN (FOND DU LAC, GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) | $41.43 | $29.99 | $71.42 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC WORK | $60.13 | $30.16 | $90.29 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC WORK (DODGE, GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) | $58.92 | $31.34 | $90.26 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $39.75 | $25.10 | $64.85 Above median +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $39.89 | $28.04 | $67.93 Above median +168% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $40.84 | $25.66 | $66.50 Above median +163% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE, DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MENOMINEE, OCONTO, OUTA | $53.23 | $23.40 | $76.63 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE, DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MENOMINEE, OCONTO, OUTA | $50.02 | $23.29 | $73.31 Bottom 10% +94% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: INCLUDING HVAC WORK | $49.32 | $27.18 | $76.50 Bottom 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: INCLUDING HVAC WORK | $57.35 | $29.37 | $86.72 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER/PIPEFITTER: INCLUDING HVAC WORK | $50.94 | $25.98 | $76.92 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDING HVAC WORK | $60.57 | $27.34 | $87.91 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER: INCLUDING HVAC WORK (DODGE, GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) | $60.05 | $27.90 | $87.95 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $23.36 | $4.61 | $27.97 Above median -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.37 | $7.45 | $24.82 Above median -29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR | $17.45 | $7.61 | $25.06 Above median -28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $15.52 | $3.21 | $18.73 -22% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $40.43 | $29.99 | $70.42 Above median +93% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $31.97 | $20.67 | $52.64 +44% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $45.07 | $31.04 | $76.11 +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $46.47 | $31.33 | $77.80 Above median +113% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $58.03 | $29.98 | $88.01 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $48.92 | $38.21 | $87.13 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $48.51 | $35.86 | $84.37 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $42.00 | $31.56 | $73.56 Bottom 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $51.92 | $34.78 | $86.70 Above median +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $45.63 | $29.02 | $74.65 +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER: INCLUDING HVAC WORK | $42.90 | $32.47 | $75.37 +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: INSTALLER (DODGE, FOND DU LAC, AND MANITOWOC COUNTIES) | $37.13 | $21.58 | $58.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SOUND & COMMUNICATIONS: TECHNICIAN (DODGE, FOND DU LAC, AND MANITOWOC COUNTIES) | $37.13 | $21.58 | $58.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE LAYER | $38.39 | $29.79 | $68.18 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $39.19 | $28.90 | $68.09 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $15.28 | $4.78 | $20.06 Above median -27% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 AXLE TRUCKS | $35.79 | $24.13 | $59.92 Bottom 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 2 AXLE TRUCKS | $39.57 | $28.57 | $68.14 Top 10% +147% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: 3 OR MORE AXLES | $39.72 | $28.57 | $68.29 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Dodge, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Dodge
Compliance Notes
- This wage determination applies to federal contracts for building construction in Dodge, Wisconsin.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.