Building Construction — Dane, Wisconsin

WD WI20260005-17058-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER in Dane, Wisconsin (construction type: building) is $45.88/hr base + $38.15/hr fringe = $84.03/hr total package (WD WI20260005-17058-bld, Rev. 1).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: WI20260005-17058-bld
Revision: 1
Construction Type: building
State: Wisconsin (WI)
County: Dane
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference WI20260005View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER $45.88 $38.15 $84.03 Top 10% $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKER/HEAT AND FROST INSULATOR $25.36 $8.37 $33.73 Above median +28% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.52 $34.63 $81.15 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.39 $29.79 $68.18 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $30.37 $29.79 $60.16 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.78 $29.79 $71.57 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $33.09 $29.79 $62.88 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.17 $28.66 $69.83 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $42.45 $28.78 $71.23 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.28 $27.54 $67.82 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $48.55 $25.91 $74.46 Above median +106% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O $31.17 $20.08 $51.25 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MO $65.17 $38.44 $103.61 +275% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $48.97 $24.77 $73.74 Above median +152% vs market $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $41.60 $27.89 $69.49 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $43.13 $27.89 $71.02 Bottom 10% $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.20 $27.89 $73.09 $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $45.73 $27.89 $73.62 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $49.28 $27.89 $77.17 Above median $0.00 $0.00 $0.00 $0.00
HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER $50.53 $27.89 $78.42 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $44.00 $32.66 $76.66 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL $37.70 $19.97 $57.67 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER $36.65 $19.97 $56.62 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: CONCRETE WORKER $16.34 $3.59 $19.93 Top 10% -20% vs market $0.00 $0.00 $0.00 $0.00
LABORERS: LANDSCAPE $8.73 $4.90 $13.63 Above median -45% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $42.00 $28.85 $70.85 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
PAINTER. PREMIUM RATES [ADD TO BASIC HOURLY RATE] SANDBLASTER $1.00 PER HOUR DRYWALL TAPER & APPLICATOR $1.30 PER HOUR $37.65 $21.17 $58.82 +145% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $44.45 $28.78 $73.23 Above median $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC WORK $58.92 $31.34 $90.26 Bottom 10% +139% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $38.22 $30.40 $68.62 Above median +171% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $60.57 $27.34 $87.91 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $18.01 $3.28 $21.29 -11% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $51.92 $34.78 $86.70 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $42.45 $28.78 $71.23 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $51.68 $29.73 $81.41 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
TILE & MARBLE FINISHER $13.89 $7.58 $21.47 Bottom 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $39.72 $28.70 $68.42 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Dane, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Dane

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WI20260005-17058-bld →