Building Construction — Dane, Wisconsin
WD WI20260005-17058-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER in Dane, Wisconsin (construction type: building) is $45.88/hr base + $38.15/hr fringe = $84.03/hr total package (WD WI20260005-17058-bld, Rev. 1).
Scroll down for all 37 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER | $45.88 | $38.15 | $84.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ASBESTOS WORKER/HEAT AND FROST INSULATOR | $25.36 | $8.37 | $33.73 Above median +28% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $46.52 | $34.63 | $81.15 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $38.39 | $29.79 | $68.18 Above median +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $30.37 | $29.79 | $60.16 Above median +59% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.78 | $29.79 | $71.57 Above median +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $33.09 | $29.79 | $62.88 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $41.17 | $28.66 | $69.83 Above median +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $42.45 | $28.78 | $71.23 Top 10% +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $40.28 | $27.54 | $67.82 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $48.55 | $25.91 | $74.46 Above median +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O | $31.17 | $20.08 | $51.25 Top 10% +42% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MO | $65.17 | $38.44 | $103.61 +275% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $48.97 | $24.77 | $73.74 Above median +152% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $41.60 | $27.89 | $69.49 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $43.13 | $27.89 | $71.02 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $45.20 | $27.89 | $73.09 | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $45.73 | $27.89 | $73.62 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $49.28 | $27.89 | $77.17 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER | $50.53 | $27.89 | $78.42 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $44.00 | $32.66 | $76.66 Above median +73% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, GENERAL | $37.70 | $19.97 | $57.67 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER | $36.65 | $19.97 | $56.62 Top 10% +127% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: CONCRETE WORKER | $16.34 | $3.59 | $19.93 Top 10% -20% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORERS: LANDSCAPE | $8.73 | $4.90 | $13.63 Above median -45% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $42.00 | $28.85 | $70.85 Above median +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER. PREMIUM RATES [ADD TO BASIC HOURLY RATE] SANDBLASTER $1.00 PER HOUR DRYWALL TAPER & APPLICATOR $1.30 PER HOUR | $37.65 | $21.17 | $58.82 +145% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVERMAN | $44.45 | $28.78 | $73.23 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER: INCLUDING HVAC WORK | $58.92 | $31.34 | $90.26 Bottom 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $38.22 | $30.40 | $68.62 Above median +171% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $60.57 | $27.34 | $87.91 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $18.01 | $3.28 | $21.29 -11% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $51.92 | $34.78 | $86.70 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SOFT FLOOR LAYER | $42.45 | $28.78 | $71.23 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SPRINKLER FITTER | $51.68 | $29.73 | $81.41 Above median +116% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE & MARBLE FINISHER | $13.89 | $7.58 | $21.47 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER | $39.72 | $28.70 | $68.42 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Dane, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Dane
Compliance Notes
- This wage determination applies to federal contracts for building construction in Dane, Wisconsin.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.