Residential Construction — Barron, Wisconsin

WD WI20260021-17040-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Barron, Wisconsin (construction type: residential) is $27.03/hr base + $9.38/hr fringe = $36.41/hr total package (WD WI20260021-17040-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: WI20260021-17040-res
Revision: 1
Construction Type: residential
State: Wisconsin (WI)
County: Barron
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference WI20260021View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $27.03 $9.38 $36.41 +25% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $24.11 $1.49 $25.60 -16% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $44.29 $25.21 $69.50 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $23.16 $25.82 $48.98 +36% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.77 $0.00 $14.77 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $17.10 $12.15 $29.25 +22% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH AND ROLLER $37.65 $21.17 $58.82 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $52.24 $27.56 $79.80 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $41.29 $25.98 $67.27 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $27.74 $1.26 $29.00 -21% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $17.00 $3.45 $20.45 Above median -26% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Barron, WI — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Barron

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WI20260021-17040-res →