Building Construction — Adams, Wisconsin

WD WI20260011-17039-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI in Adams, Wisconsin (construction type: building) is $45.88/hr base + $38.15/hr fringe = $84.03/hr total package (WD WI20260011-17039-bld, Rev. 1).

Scroll down for all 112 trade classifications covered by this determination.

WD Number: WI20260011-17039-bld
Revision: 1
Construction Type: building
State: Wisconsin (WI)
County: Adams
Effective: May 17, 2026
Trades covered: 112
Official source: SAM.gov reference WI20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $45.88 $38.15 $84.03 +220% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COATINGS, COVERINGS, AND FINISHES TO ALL TYPES OF MECHANI $55.34 $34.03 $89.37 Top 10% +240% vs market $0.00 $0.00 $0.00 $0.00
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS; PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANI $49.17 $23.83 $73.00 Top 10% +178% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $46.52 $34.63 $81.15 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $44.71 $28.90 $73.61 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $41.17 $28.66 $69.83 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER & TILE SETTER $40.09 $28.10 $68.19 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER & TILE SETTER $39.36 $28.83 $68.19 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER & TILE SETTER $40.34 $29.49 $69.83 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER & TILE SETTER $39.50 $28.69 $68.19 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER & TILE SETTER $48.60 $29.31 $77.91 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER $40.14 $29.67 $69.81 Bottom 10% +84% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE LAYER $41.17 $28.66 $69.83 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, CEMENT MASON, TILE SETTER $38.45 $27.41 $65.86 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER, TILE SETTER $48.60 $29.31 $77.91 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: BRICKLAYER,CEMENT MASON,TILE SETTER $39.36 $28.83 $68.19 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER: CEMENT MASON/CONCRETE FINISHER $46.01 $29.31 $75.32 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
CABINET INSTALLER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDING DRYWALL HANGING, ACOUSTICAL WORK: PILEDRIVERMAN $44.45 $28.78 $73.23 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (ADAMS, BAYFIELD, FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO, TAYLOR, VILAS, AND WOOD COUNTI $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (BARRON, BURNETT, CLARK, DUNN, POLK, RUSK, SAWYER, AND WASHBURN COUNTIES) $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (DOOR, FLORENCE, KEWAUNEE, MARINETTE, MENOMINEE, OCONTO, AND SHAWANO COUNTIES) $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC AND MANITOWOC COUNTIES) $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING ACOUSTICAL WORK & DRYWALL HANGING (FOND DU LAC, GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) $41.43 $29.99 $71.42 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BURNETT AND POLK COUNTIES) $48.54 $28.84 $77.38 Top 10% +166% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: INCLUDING DRYWALL HANGING, ACOUSTICAL WORK (BAYFIELD COUNTY) $40.79 $27.90 $68.69 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.50 $28.90 $69.40 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $37.25 $27.84 $65.09 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $43.27 $25.69 $68.96 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $47.22 $31.90 $79.12 Top 10% +159% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ADAMS, CLARK, FOREST, JUNEAU, LANGLADE, LINCOLN, MARINETTE, MENOMINEE, ONEIDA, PORTAGE, SHAWANO, VILAS AND WOOD COUNTIES) $40.19 $22.90 $63.09 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK, CRAWFORD, DUNN, GRANT, IRON, JACKSON, MONROE, PEPIN, POLK, PRICE, RICHLAND $44.29 $25.21 $69.50 Top 10% +93% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (DODGE COUNTY, FOND DU LAC, AND MANITOWOC COUNTIES) $45.20 $25.27 $70.47 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN (DODGE, GREEN, JEFFERSON, LAFAYETTE, AND WALWORTH COUNTIES) $43.65 $23.59 $67.24 Top 10% +86% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS OVER $180,000 (FLORENCE COUNTY AND MARINETTE COUNTY) $33.94 $21.80 $55.74 Top 10% +54% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: ELECTRICAL CONTRACTS UNDER $180,000 (FLORENCE COUNTY AND MARINETTE COUNTY) $31.75 $21.73 $53.48 Top 10% +48% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: (COLUMBIA, DODGE, GREEN LAKE COUNTY, IOWA, MARQUETTE COUNTY, AND SAUK COUNTIES) $48.55 $25.91 $74.46 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: (DOOR, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, MENOMINEE, SHAWANO COUNTIES) $42.00 $23.93 $65.93 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES INCLUDING O $31.17 $20.08 $51.25 Top 10% +42% vs market $0.00 $0.00 $0.00 $0.00
EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EPA LEVEL ""C"" PROTECTION: $1.00 PER HOUR $49.28 $27.89 $77.17 Top 10% $0.00 $0.00 $0.00 $0.00
FENCE INSTALLERS $15.00 $2.37 $17.37 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $20.21 $1.86 $22.07 -25% vs market $0.00 $0.00 $0.00 $0.00
HEAT AND FROST INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHES TO ALL TYPES OF MECHANICAL $45.24 $30.56 $75.80 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $42.89 $36.86 $79.75 Above median +80% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (ADAMS, COLUMBIA, CRAWFORD, DODGE, FLORENCE, FOREST, GRANT, GREENE, GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LAFAYETTE, LANGLADE, MARATHON, MAR $44.00 $32.66 $76.66 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC, MARINETTE, OCONTO, OUTAGAMIE, SHAWANO AND WALWORTH COUNTIES) $44.66 $33.67 $78.33 Top 10% +77% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER (GREEN AND WALWORTH COUNTIES) $48.74 $49.65 $98.39 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL (ASHLAND & BAYFIELD COUNTIES) $34.59 $23.47 $58.06 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL (BAYFIELD COUNTY) $36.04 $23.47 $59.51 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL (BUFFALO, CRAWFORD, GRANT, JACKSON, JUNEAU, MONROE, RICHLAND, TREMPEALEAU, AND VERNON COUNTIES) $37.70 $19.97 $57.67 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL: ADAMS COUNTY $37.05 $19.97 $57.02 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL: AREA 1 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A $37.70 $19.97 $57.67 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL: AREA 2 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A $37.05 $19.97 $57.02 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL: AREA 3 (AREA 1: BARRON, CLARK, DUNN, PEPIN, POLK, RUSK TAYLOR AREA 2: CLARK, LANGLADE, LINCOLN, ONEIDA, PRICE, TAYLOR, VILAS, WOOD A $36.35 $19.97 $56.32 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER, GENERAL: REMAINING AREA $37.70 $19.97 $57.67 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER $36.65 $19.97 $56.62 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL AND ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BUFFALO, CRAW $36.65 $19.97 $56.62 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER, PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS $36.65 $19.97 $56.62 Top 10% +127% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (ASHLAND & BAYFIE $35.59 $23.47 $59.06 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER: PREPARATION, REMOVAL, ENCAPSULATION OF HAZARDOUS MATERIALS FROM NON-MECHANICAL SYSTEMS (BAYFIELD COUNTY) $37.04 $23.47 $60.51 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
LABORERS, GENERAL $37.05 $19.97 $57.02 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
LANDSCAPE LABORER $21.52 $18.94 $40.46 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT (ADAMS, ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC, FOREST, GRANT, GR $42.00 $28.85 $70.85 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT (BAYFIELD COUNTY) $41.90 $29.51 $71.41 Top 10% +94% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT CRANES, TOWER CRANES WITH OR W/O ATTACHMENTS OVER 100 TONS; CRANES, TOWER CRANES WITH BOOM, LEADS AND OR JIB LENGTH 176 FT O $50.53 $27.89 $78.42 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT FORKLIFT. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER HOUR EP $41.60 $27.89 $69.49 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT HYDRAULIC CRANE, 10 TONS OR LESS. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTE $45.20 $27.89 $73.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POWER EQUIPMENT TRAVELLING CRANE. HAZARDOUS WASTE PREMIUMS: EPA LEVEL ""A"" PROTECTION: $3.00 PER HOUR EPA LEVEL ""B"" PROTECTION: $2.00 PER $45.73 $27.89 $73.62 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTERS: (BRUSH & ROLLER) $14.64 $2.55 $17.19 Top 10% -29% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: SPRAY $13.72 $2.25 $15.97 Bottom 10% -34% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $41.43 $29.99 $71.42 Above median $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (ADAMS, BAYFIELD, FOREST, IRON, ONEIDA, PORTAGE, PRICE, SHAWANO, TAYLOR, VILAS, AND WOOD COUNTIES) $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (BARRON, BURNETT, CLARK, DUNN, POLK, RUSK, SAWYER, AND WASHBURN COUNTIES) $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (DOOR, FLORENCE, KEWAUNEE, MARINETTE, MENOMINEE, OCONTO, AND SHAWANO COUNTIES) $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (FOND DU LAC AND MANITOWOC COUNTIES) $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN (FOND DU LAC, GREEN LAKE, MARQUETTE, WAUPACA, AND WAUSHARA COUNTIES) $41.43 $29.99 $71.42 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC WORK $60.13 $30.16 $90.29 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDING HVAC WORK (DODGE, GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) $58.92 $31.34 $90.26 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $39.75 $25.10 $64.85 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $39.89 $28.04 $67.93 Above median +168% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $40.84 $25.66 $66.50 Above median +163% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE, DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MENOMINEE, OCONTO, OUTA $53.23 $23.40 $76.63 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER, INCLUDING HVAC WORK (ADAMS, CALUMET, DODGE, DOOR, FOND DU LAC, GREEN LAKE, KEWAUNEE, MANITOWOC, MARINETTE, MENOMINEE, OCONTO, OUTA $50.02 $23.29 $73.31 Bottom 10% +94% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC WORK $49.32 $27.18 $76.50 Bottom 10% +103% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC WORK $57.35 $29.37 $86.72 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER/PIPEFITTER: INCLUDING HVAC WORK $50.94 $25.98 $76.92 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC WORK $60.57 $27.34 $87.91 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER: INCLUDING HVAC WORK (DODGE, GREEN, JEFFERSON, AND LAFAYETTE COUNTIES) $60.05 $27.90 $87.95 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $23.36 $4.61 $27.97 Above median -20% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.37 $7.45 $24.82 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $17.45 $7.61 $25.06 Above median -28% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.52 $3.21 $18.73 -22% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $40.43 $29.99 $70.42 Above median +93% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $31.97 $20.67 $52.64 +44% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $45.07 $31.04 $76.11 +108% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $46.47 $31.33 $77.80 Above median +113% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $58.03 $29.98 $88.01 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $48.92 $38.21 $87.13 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $48.51 $35.86 $84.37 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $42.00 $31.56 $73.56 Bottom 10% +101% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $51.92 $34.78 $86.70 Above median +137% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $45.63 $29.02 $74.65 +104% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDING HVAC WORK $42.90 $32.47 $75.37 +106% vs market $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: INSTALLER (DODGE, FOND DU LAC, AND MANITOWOC COUNTIES) $37.13 $21.58 $58.71 Top 10% $0.00 $0.00 $0.00 $0.00
SOUND & COMMUNICATIONS: TECHNICIAN (DODGE, FOND DU LAC, AND MANITOWOC COUNTIES) $37.13 $21.58 $58.71 Top 10% $0.00 $0.00 $0.00 $0.00
TILE LAYER $38.39 $29.79 $68.18 Above median $0.00 $0.00 $0.00 $0.00
TILE SETTER $39.19 $28.90 $68.09 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER $15.28 $4.78 $20.06 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 AXLE TRUCKS $35.79 $24.13 $59.92 Bottom 10% +117% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 2 AXLE TRUCKS $39.57 $28.57 $68.14 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 3 OR MORE AXLES $39.72 $28.57 $68.29 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Adams, WI — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Adams

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WI20260011-17039-bld →