Highway Construction — Wyoming, West Virginia
WD WV20260095-17711-hwy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CARPENTER in Wyoming, West Virginia (construction type: highway) is $33.80/hr base + $27.34/hr fringe = $61.14/hr total package (WD WV20260095-17711-hwy, Rev. 1).
Scroll down for all 27 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CARPENTER | $33.80 | $27.34 | $61.14 Above median +169% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 Above median +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $36.10 | $24.25 | $60.35 +67% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.00 | $17.40 | $46.40 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: COMMON OR GENERAL | $29.00 | $17.40 | $46.40 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GRADE CHECKER | $29.00 | $17.40 | $46.40 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GUARDRAIL INSTALLATION | $29.00 | $17.40 | $46.40 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: LASER SCREED OPERATOR | $30.03 | $17.40 | $47.43 Top 10% +154% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $29.00 | $17.40 | $46.40 Top 10% +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $32.75 | $18.52 | $51.27 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BROOM/SWEEPER | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BULLDOZER | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CONCRETE SCREED | $27.83 | $18.71 | $46.54 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: CRANE | $40.35 | $20.30 | $60.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: DRILL | $37.59 | $20.30 | $57.89 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: FORKLIFT | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: GRADER/BLADE | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: LOADER (SIX CUBIC YARDS CAPACITY AND OVER) | $40.35 | $20.30 | $60.65 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MECHANIC | $34.20 | $19.75 | $53.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: MILLING MACHINE | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: POST DRIVER | $37.59 | $20.30 | $57.89 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $36.48 | $20.30 | $56.78 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: FLAGGER | $25.17 | $16.37 | $41.54 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRAFFIC CONTROL: MAINTENANCE PERSON | $27.91 | $17.40 | $45.31 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: DUMP TRUCK | $27.76 | $16.15 | $43.91 Top 10% +86% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Wyoming, WV — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Wyoming
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Wyoming, West Virginia.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.