Heavy Construction — Webster, West Virginia
WD WV20260061-17503-hvy · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for CEMENT MASON/CONCRETE FINISHER in Webster, West Virginia (construction type: heavy) is $35.77/hr base + $27.54/hr fringe = $63.31/hr total package (WD WV20260061-17503-hvy, Rev. 1).
Scroll down for all 18 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| CEMENT MASON/CONCRETE FINISHER | $35.77 | $27.54 | $63.31 Above median +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.20 | $20.39 | $62.59 Above median +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL | $35.50 | $29.11 | $64.61 Above median +78% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $34.84 | $25.40 | $60.24 Above median +66% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: CHAIN SAW, COMMON, FLAGGER, LANDSCAPE, PIPELAYER, SANDBLASTER | $25.26 | $16.50 | $41.76 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 1 TUNNEL DRILLER, TUNNEL MINER | $27.35 | $16.50 | $43.85 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 2 AIR TOOL OPERATOR, CHAIN SAW, COMPACTOR HAND HELD, CONCRETE WORKER, HAND HELD DRILL, FORM WORK ONLY, GRADE CHECKER, GROUTING, PIPELAY | $26.32 | $16.50 | $42.82 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 3 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER, LANDSCAPE | $25.26 | $16.50 | $41.76 Top 10% +124% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $26.17 | $16.50 | $42.67 Above median +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $39.60 | $26.06 | $65.66 +104% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, BOOM TRUCKS, LOADERS OF SIX CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF | $41.95 | $20.45 | $62.40 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, BOBCAT/SKID STEER/SKID LOADER, FORKLIFT, DRILL, EXCAVATO | $39.19 | $20.45 | $59.64 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER | $38.08 | $20.45 | $58.53 Top 10% +143% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 OILER | $34.62 | $20.45 | $55.07 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: MECHANIC | $36.57 | $19.18 | $55.75 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 1 BOOM, BULLDOZER, EXCAVATOR, MECHANIC, PIPE BENDING MACHINE | $41.95 | $20.45 | $62.40 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: PIPELINE: GROUP 2 OILER | $39.19 | $20.45 | $59.64 Top 10% +148% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $41.95 | $20.45 | $62.40 Top 10% +160% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Webster, WV — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Webster
Compliance Notes
- This wage determination applies to federal contracts for heavy construction in Webster, West Virginia.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.