Heavy Construction — Wayne, West Virginia

WD WV20260076-17694-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Wayne, West Virginia (construction type: heavy) is $25.40/hr base + $11.34/hr fringe = $36.74/hr total package (WD WV20260076-17694-hvy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: WV20260076-17694-hvy
Revision: 1
Construction Type: heavy
State: West Virginia (WV)
County: Wayne
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference WV20260076View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $25.40 $11.34 $36.74 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.77 $27.54 $63.31 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $26.38 $17.06 $43.44 +41% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $36.10 $24.65 $60.75 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $30.70 $11.64 $42.34 +17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.50 $29.11 $64.61 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.17 $16.50 $42.67 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $24.13 $9.56 $33.69 +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE WORKER $25.41 $16.50 $41.91 +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 ASPHALT RAKER, BULL FLOAT MAN, CHAIN SAW, HAND HELD DRILL, GRADE CHECKER, PIPELAYER, WACKER ROLLER OPERATOR $26.32 $16.50 $42.82 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 FLAGGER, COMMON OR GENERAL, LANDSCAPE $25.26 $16.50 $41.76 +124% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $26.17 $16.50 $42.67 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: TAMPER $25.41 $16.50 $41.91 +125% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $24.80 $14.79 $39.59 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $28.71 $11.59 $40.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $21.44 $14.42 $35.86 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.39 $15.50 $39.89 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $34.49 $17.53 $52.02 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $35.19 $19.18 $54.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, LOADERS OF SIX CUBIC YARD CAPACITY AND OVER, EXCAVATORS AND SHOVELS WITH AN OPERATING WEIGHT OF ONE HUNDRED $41.95 $20.45 $62.40 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, EXCAVATORS $39.19 $20.45 $59.64 Top 10% +148% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, DUMP..$ 22.46 13.49 OPERATOR: ROLLER $23.49 $14.88 $38.37 +63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $30.98 $15.98 $46.96 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $31.77 $15.98 $47.75 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $31.77 $15.98 $47.75 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Wayne, WV — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Wayne

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260076-17694-hvy →