Highway Construction — Roane, West Virginia

WD WV20260092-17701-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Roane, West Virginia (construction type: highway) is $27.72/hr base + $19.44/hr fringe = $47.16/hr total package (WD WV20260092-17701-hwy, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: WV20260092-17701-hwy
Revision: 1
Construction Type: highway
State: West Virginia (WV)
County: Roane
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference WV20260092View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $27.72 $19.44 $47.16 +107% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.77 $27.54 $63.31 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $34.20 $22.71 $56.91 +57% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $29.00 $17.40 $46.40 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $26.19 $16.30 $42.49 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $29.00 $17.40 $46.40 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GUARDRAIL INSTALLATION $29.00 $17.40 $46.40 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LASER SCREED OPERATOR $30.03 $17.40 $47.43 Top 10% +154% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.00 $17.40 $46.40 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: SIGN AND DISPLAY ERECTOR $29.00 $17.40 $46.40 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $30.49 $18.60 $49.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE SCREED $31.35 $17.96 $49.31 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $40.35 $20.30 $60.65 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $37.59 $20.30 $57.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $34.70 $18.98 $53.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $35.04 $20.10 $55.14 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: POST DRIVER $37.59 $20.30 $57.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $29.38 $18.60 $47.98 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL PERSON $27.91 $17.40 $45.31 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $28.58 $18.60 $47.18 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Roane, WV — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Roane

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260092-17701-hwy →