Building Construction — Putnam, West Virginia

WD WV20260047-17664-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Putnam, West Virginia (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD WV20260047-17664-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: WV20260047-17664-bld
Revision: 1
Construction Type: building
State: West Virginia (WV)
County: Putnam
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference WV20260047View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 Above median +318% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 +157% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.65 $25.56 $57.21 Above median +154% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $33.84 $25.51 $59.35 Above median +161% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $32.52 $22.34 $54.86 Above median +143% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43 Above median +172% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.00 $23.45 $62.45 Above median +103% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $36.10 $24.65 $60.75 +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.19 $25.66 $60.85 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE, WATER BOY $24.16 $17.25 $41.41 +122% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 BOBCAT OPERATOR, CHIPPING GUNS, CONCRETE SAW, CONCRETE WORKER, FENCE ERECTION, GRADE CHECKER, JACK HAMMER, MASON TENDER-BRICK, MASON $24.78 $17.25 $42.03 +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $23.76 $10.73 $34.49 Above median +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $23.10 $16.75 $39.85 Above median +114% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $31.65 $25.56 $57.21 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 +98% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $30.85 $17.80 $48.65 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $38.04 $39.72 $77.76 Above median +226% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $32.52 $22.34 $54.86 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $41.00 $37.63 $78.63 Above median +230% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS $45.21 $22.05 $67.26 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER $34.71 $22.05 $56.76 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.75 $16.71 $46.46 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $32.07 $27.52 $59.59 +73% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.00 $22.57 $49.57 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.65 $25.56 $57.21 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 DUMP TRUCK, TRACTOR HAUL TRUCK, WATER TANK TRUCK..$ 29.96 22.50 TRUCK DRIVER: GROUP 2 DUMP TRUCK, WATER TANK TRUCK $29.81 $22.50 $52.31 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Putnam, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Putnam

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260047-17664-bld →