Building Construction — Mingo, West Virginia

WD WV20260019-17805-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Mingo, West Virginia (construction type: building) is $38.05/hr base + $30.87/hr fringe = $68.92/hr total package (WD WV20260019-17805-bld, Rev. 1).

Scroll down for all 48 trade classifications covered by this determination.

WD Number: WV20260019-17805-bld
Revision: 1
Construction Type: building
State: West Virginia (WV)
County: Mingo
Effective: May 17, 2026
Trades covered: 48
Official source: SAM.gov reference WV20260019View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $38.05 $30.87 $68.92 Above median +280% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 +157% vs market $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $31.65 $25.56 $57.21 Above median $0.00 $0.00 $0.00 $0.00
BRICKLAYER $27.50 $12.35 $39.85 +77% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.00 $21.15 $51.15 +125% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $25.08 $12.58 $37.66 +66% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $29.81 $23.45 $53.26 +134% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, ALL OTHER WORK $25.62 $11.90 $37.52 Top 10% +65% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $34.77 $26.66 $61.43 Above median +172% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.16 $15.11 $43.27 +41% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $26.01 $12.18 $38.19 +5% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.19 $25.66 $60.85 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING $36.10 $24.65 $60.75 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER $28.02 $16.80 $44.82 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
LABORER $25.79 $16.19 $41.98 Above median +125% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.04 $16.35 $40.39 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.34 $16.41 $40.75 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.35 $16.20 $40.55 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER $23.63 $16.43 $40.06 +115% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.24 $16.27 $40.51 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.29 $16.27 $40.56 Above median +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.78 $16.25 $41.03 Above median +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.19 $16.23 $40.42 Above median +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (Airtool Operator, Asbestos Abatement, Bobcat Operator, Dewatering, Rodman, Skytrak Forklift Operator) $34.77 $26.66 $61.43 Top 10% +230% vs market $0.00 $0.00 $0.00 $0.00
LABORER GROUP 2 (Concrete Saw, Grouting) $31.97 $25.36 $57.33 Top 10% +208% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY $25.41 $16.75 $42.16 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.66 $8.78 $29.44 Above median +58% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW $22.76 $16.75 $39.51 +112% vs market $0.00 $0.00 $0.00 $0.00
LABORER: DEMOLITION $20.58 $9.47 $30.05 Top 10% +61% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $21.47 $8.29 $29.76 Above median +60% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $22.05 $8.54 $30.59 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.00 $26.18 $59.18 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $30.24 $10.26 $40.50 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $30.31 $10.81 $41.12 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.09 $3.00 $36.09 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $22.03 $9.95 $31.98 Above median +53% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $30.57 $20.06 $50.63 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $27.64 $18.09 $45.73 Bottom 10% +92% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $24.13 $16.05 $40.18 $0.00 $0.00 $0.00 $0.00
PLUMBER $36.58 $24.58 $61.16 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES $45.21 $22.05 $67.26 Top 10% +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER $34.71 $22.05 $56.76 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION.$ 25.61 15.68 ROOFER $24.28 $9.32 $33.60 Top 10% -3% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS $28.52 $3.00 $31.52 Above median +34% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mingo, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mingo

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260019-17805-bld →