Heavy Construction — Lincoln, West Virginia

WD WV20260077-17714-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lincoln, West Virginia (construction type: heavy) is $29.00/hr base + $22.41/hr fringe = $51.41/hr total package (WD WV20260077-17714-hvy, Rev. 1).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: WV20260077-17714-hvy
Revision: 1
Construction Type: heavy
State: West Virginia (WV)
County: Lincoln
Effective: May 17, 2026
Trades covered: 30
Official source: SAM.gov reference WV20260077View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $29.00 $22.41 $51.41 +126% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.77 $27.54 $63.31 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $28.70 $17.12 $45.82 +49% vs market $0.00 $0.00 $0.00 $0.00
INSULATOR - PIPE & PIPEWRAPPER $38.05 $28.47 $66.52 Above median +266% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL $35.50 $29.11 $64.61 Above median +78% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: REINFORCING AND STRUCTURAL $36.10 $24.65 $60.75 Above median +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.17 $16.50 $42.67 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: AIR TOOL OPERATOR $29.05 $16.95 $46.00 +147% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $29.05 $16.95 $46.00 Above median +147% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 ASPHALT RAKER, CHAIN SAW, CONCRETE SAW, CONCRETE WORKER, HAND HELD DRILL $26.32 $16.50 $42.82 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 CARPENTER TENDER, COMMON OR GENERAL, FLAGGER $25.26 $16.50 $41.76 +124% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER-CEMENT/CONCRETE $29.05 $16.95 $46.00 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $22.82 $10.95 $33.77 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WACKER ROLLER OPERATOR $29.05 $16.95 $46.00 Top 10% +147% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $39.60 $26.06 $65.66 +104% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $25.28 $14.99 $40.27 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $28.71 $11.59 $40.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $25.43 $13.10 $38.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $24.39 $15.50 $39.89 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $21.44 $14.42 $35.86 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $24.39 $15.50 $39.89 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $34.49 $17.53 $52.02 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVERMAN $25.05 $8.33 $33.38 Bottom 10% $0.00 $0.00 $0.00 $0.00
PIPELINE: OPERATOR-EXCAVATOR $41.95 $20.45 $62.40 $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $35.19 $19.18 $54.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANE, LOADERS OF SIX CUBIC YARD CAPACITY AND OVER $41.95 $20.45 $62.40 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 LOADERS UP TO SIX CUBIC YARD CAPACITY, BACKHOE, BULLDOZERS, COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, TRACTOR, TR $39.19 $20.45 $59.64 +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER $38.08 $20.45 $58.53 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 1 SINGLE AXLE TRUCKS USED AS DUMPS, PICK-UP TRUCKS $27.12 $16.60 $43.72 +85% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 OFF THE ROAD TRUCKS, REAR DUMP TRUCKS, ARTICULATING DUMPS, TRACTOR HAUL TRUCK.$ 28.59 16.60 TRUCK DRIVER: GROUP 2 TANDEM AND TRI $27.91 $16.60 $44.51 +89% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, WV — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lincoln

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260077-17714-hvy →