Building Construction — Jefferson, West Virginia

WD WV20260037-17012-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY in Jefferson, West Virginia (construction type: building) is $40.77/hr base + $20.17/hr fringe = $60.94/hr total package (WD WV20260037-17012-bld, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: WV20260037-17012-bld
Revision: 1
Construction Type: building
State: West Virginia (WV)
County: Jefferson
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference WV20260037View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY $40.77 $20.17 $60.94 +236% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 +157% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.53 $25.47 $57.00 Above median +153% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $29.40 $20.25 $49.65 +118% vs market $0.00 $0.00 $0.00 $0.00
CREDIT $57.16 $38.44 $95.60 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.20 $20.39 $62.59 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE $30.21 $10.43 $40.64 Top 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $23.20 $4.02 $27.22 +15% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $31.65 $24.50 $56.15 +55% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL AND REINFORCING $35.19 $25.66 $60.85 +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.95 $3.30 $21.25 Above median +14% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CARPENTER TENDER, DEMOLITION $24.94 $16.20 $41.14 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 CONCRETE SAW, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER, SKYTRAK FORKLIFT OPERATOR $24.94 $16.20 $41.14 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 PIPELAYER $24.94 $16.20 $41.14 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $22.81 $16.50 $39.31 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $28.90 $23.91 $52.81 $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $21.51 $7.36 $28.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: EXCAVATOR $23.27 $11.95 $35.22 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $22.33 $9.95 $32.28 Above median +55% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $25.76 $19.46 $45.22 +90% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $40.20 $22.00 $62.20 Above median +161% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS $45.21 $22.05 $67.26 +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER $34.71 $22.05 $56.76 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $29.75 $16.71 $46.46 Above median +145% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION $30.73 $24.03 $54.76 Above median +59% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION..$ 30.23 24.03 SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION $27.73 $24.03 $51.76 +50% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $30.96 $15.81 $46.77 +96% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.00 $22.57 $49.57 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.65 $25.56 $57.21 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 DUMP TRUCK, TRACTOR HAUL TRUCK, WATER TANK TRUCK..$ 29.96 22.50 TRUCK DRIVER: GROUP 2 DUMP TRUCK, WATER TANK TRUCK $29.81 $22.50 $52.31 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Jefferson, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Jefferson

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260037-17012-bld →