Building Construction — Harrison, West Virginia

WD WV20260011-17697-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Harrison, West Virginia (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD WV20260011-17697-bld, Rev. 1).

Scroll down for all 26 trade classifications covered by this determination.

WD Number: WV20260011-17697-bld
Revision: 1
Construction Type: building
State: West Virginia (WV)
County: Harrison
Effective: May 17, 2026
Trades covered: 26
Official source: SAM.gov reference WV20260011View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 Above median +318% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 +157% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.65 $25.82 $57.47 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $43.77 $27.72 $71.49 Above median +133% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $35.19 $25.66 $60.85 +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.13 $16.20 $40.33 Above median +116% vs market $0.00 $0.00 $0.00 $0.00
LABORER $24.45 $16.41 $40.86 Above median +119% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $25.92 $16.88 $42.80 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, WATER BOY $24.13 $16.05 $40.18 +116% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 CONCRETE WORKER, DEWATERING, GRADE CHECKER, MASON TENDER-BRICK, MORTAR MIXER, RIGGING AND SIGNALING, SCAFFOLD BUILDER, SKYTRAK FORKLI $24.13 $16.05 $40.18 +116% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.00 $26.18 $59.18 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $33.09 $3.00 $36.09 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $29.47 $18.72 $48.19 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $26.36 $17.68 $44.04 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $34.05 $41.05 $75.10 Above median +215% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $34.05 $41.05 $75.10 Above median +215% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, EXCAVATOR, BULLDOZER, ALL OTHER CRANES $45.21 $22.05 $67.26 +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, OILER $34.71 $22.05 $56.76 +136% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $24.28 $9.32 $33.60 +77% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.92 $29.70 $64.62 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $43.26 $28.90 $72.16 Above median +202% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS $28.52 $3.00 $31.52 Above median +34% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Harrison, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Harrison

Compliance Notes

Full Davis-Bacon compliance guide →