Heavy Construction — Hampshire, West Virginia

WD WV20260078-17496-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Hampshire, West Virginia (construction type: heavy) is $36.05/hr base + $19.86/hr fringe = $55.91/hr total package (WD WV20260078-17496-hvy, Rev. 1).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: WV20260078-17496-hvy
Revision: 1
Construction Type: heavy
State: West Virginia (WV)
County: Hampshire
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference WV20260078View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $36.05 $19.86 $55.91 Top 10% +146% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.77 $27.54 $63.31 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.20 $20.39 $62.59 Above median +104% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL AND STRUCTURAL $35.50 $29.11 $64.61 Top 10% +78% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $34.84 $25.40 $60.24 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
LABORER $26.17 $16.50 $42.67 Above median +129% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER $26.17 $16.75 $42.92 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FLAGGER $21.76 $10.95 $32.71 Top 10% +75% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 COMMON OR GENERAL $25.26 $16.50 $41.76 +124% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $22.82 $10.95 $33.77 Above median +81% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $24.39 $15.50 $39.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $24.75 $14.94 $39.69 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOOM $28.71 $11.59 $40.30 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $24.39 $15.50 $39.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $27.06 $15.50 $42.56 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $22.03 $14.64 $36.67 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $34.49 $17.53 $52.02 Above median +149% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DRILL $35.19 $19.18 $54.37 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, EXCAVATORS WITH AN OPERATING WEIGHT OF ONE HUNDRED TEN THOUSAND POUNDS AND OVER $41.95 $20.45 $62.40 +160% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 COMPACTOR, FORKLIFT, GRADER/BLADE, MECHANIC, EXCAVATORS WITH AN OPERATING WEIGHT OF UP TO ONE HUNDRED TEN THOUSAND P $39.19 $20.45 $59.64 +148% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 ROLLER $38.08 $20.45 $58.53 Top 10% +143% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, DUMP..$ 22.39 12.01 OPERATOR: PAVER $24.39 $15.50 $39.89 +69% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FLATBED TRUCK $30.98 $15.98 $46.96 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: OFF THE ROAD TRUCK $31.77 $15.98 $47.75 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: TRACTOR HAUL TRUCK $31.77 $15.98 $47.75 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Hampshire, WV — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Hampshire

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260078-17496-hvy →