Building Construction — Brooke, West Virginia

WD WV20260050-17611-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Brooke, West Virginia (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD WV20260050-17611-bld, Rev. 1).

Scroll down for all 38 trade classifications covered by this determination.

WD Number: WV20260050-17611-bld
Revision: 1
Construction Type: building
State: West Virginia (WV)
County: Brooke
Effective: May 17, 2026
Trades covered: 38
Official source: SAM.gov reference WV20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $46.50 $29.43 $75.93 Above median +318% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $47.13 $28.93 $76.06 +157% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $31.70 $25.93 $57.63 Above median +156% vs market $0.00 $0.00 $0.00 $0.00
BRICKLAYER $32.64 $23.95 $56.59 Above median +151% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $30.51 $26.05 $56.56 +149% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $23.23 $12.13 $35.36 +55% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $30.38 $22.87 $53.25 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $39.25 $31.23 $70.48 Above median +130% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.89 $13.38 $46.27 +95% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER: ORNAMENTAL, REINFORCING, SHEETING AND STRUCTURAL $35.19 $25.66 $60.85 +68% vs market $0.00 $0.00 $0.00 $0.00
LABORER $21.86 $16.02 $37.88 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER $21.88 $16.03 $37.91 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT RAKER, DEMOLITION, GRADE CHECKER, JACK HAMMER, MORTAR MIXER, PLASTER TENDER, SCAFFOLD BUILDER, SKYTRAK FORKLIFT OPERATOR, TAMPER, WAT $25.92 $16.88 $42.80 +130% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 1 LANDSCAPE, COMMON OR GENERAL $24.94 $16.20 $41.14 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 CHAIN SAW, CONCRETE SAW, DEWATERING, CONCRETE WORKER, FENCE ERECTION, GROUTING, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, ROD $24.94 $16.20 $41.14 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 PIPELAYER $24.94 $16.20 $41.14 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 FLAGGER $24.94 $16.20 $41.14 +121% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MOTORIZED BUGGY OPERATOR $21.83 $16.00 $37.83 +103% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $22.81 $16.50 $39.31 Above median +111% vs market $0.00 $0.00 $0.00 $0.00
LABORER: WACKER ROLLER OPERATOR $23.07 $11.07 $34.14 Above median +83% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $33.00 $26.18 $59.18 Above median $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $37.40 $26.06 $63.46 +98% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $21.51 $7.36 $28.87 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.24 $16.15 $41.39 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $29.47 $18.72 $48.19 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $30.57 $20.06 $50.63 Above median +142% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION $25.32 $19.97 $45.29 Bottom 10% +90% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $30.50 $22.22 $52.72 Above median $0.00 $0.00 $0.00 $0.00
PLUMBER $38.04 $39.72 $77.76 Above median +226% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP $46.56 $22.05 $68.61 Top 10% +185% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER $46.21 $22.05 $68.26 Top 10% +184% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS $45.21 $22.05 $67.26 +180% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER $34.71 $22.05 $56.76 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $34.00 $19.11 $53.11 Above median +180% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $34.92 $29.70 $64.62 Above median +87% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.00 $22.57 $49.57 Above median +121% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $31.65 $25.56 $57.21 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 3 DUMP TRUCK, TRACTOR HAUL TRUCK, WATER TANK TRUCK..$ 29.96 22.50 TRUCK DRIVER: GROUP 2 DUMP TRUCK, WATER TANK TRUCK $29.81 $22.50 $52.31 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Brooke, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Brooke

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WV20260050-17611-bld →