Building Construction — Brooke, West Virginia
WD WV20260050-17611-bld · Revision 1 · Effective May 17, 2026
The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Brooke, West Virginia (construction type: building) is $46.50/hr base + $29.43/hr fringe = $75.93/hr total package (WD WV20260050-17611-bld, Rev. 1).
Scroll down for all 38 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 Above median +318% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 +157% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $31.70 | $25.93 | $57.63 Above median +156% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| BRICKLAYER | $32.64 | $23.95 | $56.59 Above median +151% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $30.51 | $26.05 | $56.56 +149% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $23.23 | $12.13 | $35.36 +55% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON/CONCRETE FINISHER | $30.38 | $22.87 | $53.25 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $39.25 | $31.23 | $70.48 Above median +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| GLAZIER | $32.89 | $13.38 | $46.27 +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER: ORNAMENTAL, REINFORCING, SHEETING AND STRUCTURAL | $35.19 | $25.66 | $60.85 +68% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $21.86 | $16.02 | $37.88 +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER | $21.88 | $16.03 | $37.91 +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: ASPHALT RAKER, DEMOLITION, GRADE CHECKER, JACK HAMMER, MORTAR MIXER, PLASTER TENDER, SCAFFOLD BUILDER, SKYTRAK FORKLIFT OPERATOR, TAMPER, WAT | $25.92 | $16.88 | $42.80 +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 1 LANDSCAPE, COMMON OR GENERAL | $24.94 | $16.20 | $41.14 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 2 CHAIN SAW, CONCRETE SAW, DEWATERING, CONCRETE WORKER, FENCE ERECTION, GROUTING, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, ROD | $24.94 | $16.20 | $41.14 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 3 PIPELAYER | $24.94 | $16.20 | $41.14 Above median +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: GROUP 4 FLAGGER | $24.94 | $16.20 | $41.14 +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: MOTORIZED BUGGY OPERATOR | $21.83 | $16.00 | $37.83 +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: POWER TOOL OPERATOR | $22.81 | $16.50 | $39.31 Above median +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER: WACKER ROLLER OPERATOR | $23.07 | $11.07 | $34.14 Above median +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| MASON - STONE | $33.00 | $26.18 | $59.18 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: BACKHOE | $21.51 | $7.36 | $28.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OPERATOR: ROLLER | $25.24 | $16.15 | $41.39 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER | $29.47 | $18.72 | $48.19 Above median +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 Above median +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $25.32 | $19.97 | $45.29 Bottom 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PLASTERER | $30.50 | $22.22 | $52.72 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| PLUMBER | $38.04 | $39.72 | $77.76 Above median +226% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAP | $46.56 | $22.05 | $68.61 Top 10% +185% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 Top 10% +184% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ROOFER | $34.00 | $19.11 | $53.11 Above median +180% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| SHEET METAL WORKER | $34.92 | $29.70 | $64.62 Above median +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE FINISHER | $27.00 | $22.57 | $49.57 Above median +121% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TILE SETTER | $31.65 | $25.56 | $57.21 Above median +155% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK, TRACTOR HAUL TRUCK, WATER TANK TRUCK..$ 29.96 22.50 TRUCK DRIVER: GROUP 2 DUMP TRUCK, WATER TANK TRUCK | $29.81 | $22.50 | $52.31 Top 10% +122% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Brooke, WV — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Brooke
Compliance Notes
- This wage determination applies to federal contracts for building construction in Brooke, West Virginia.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.