Building Construction — Thurston, Washington

WD WA20260116-16982-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Thurston, Washington (construction type: building) is $55.34/hr base + $20.05/hr fringe = $75.39/hr total package (WD WA20260116-16982-bld, Rev. 1).

Scroll down for all 51 trade classifications covered by this determination.

WD Number: WA20260116-16982-bld
Revision: 1
Construction Type: building
State: Washington (WA)
County: Thurston
Effective: May 17, 2026
Trades covered: 51
Official source: SAM.gov reference WA20260116View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $55.34 $20.05 $75.39 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $63.98 $19.13 $83.11 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $53.59 $23.65 $77.24 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.14 $26.56 $91.70 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $75.37 $18.82 $94.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $57.94 $34.52 $92.46 Top 10% +81% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASBESTOS ABATEMENT $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $42.25 $0.00 $42.25 Above median +54% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $38.17 $6.88 $45.05 Top 10% +64% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW CHAIN $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FIRE WATCH $40.56 $15.60 $56.16 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM STRIPPING $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $53.99 $17.05 $71.04 Top 10% +158% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $35.83 $10.89 $46.72 Top 10% +70% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $59.46 $27.32 $86.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $60.91 $27.32 $88.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $60.14 $27.32 $87.46 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BLADE FINISH $60.91 $27.32 $88.23 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.53 $9.56 $50.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP $60.14 $27.32 $87.46 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $60.14 $27.32 $87.46 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE (100 THROUGH 199 TONS, OR 150' OF BOOM) $61.81 $27.32 $89.13 $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM) $60.91 $27.32 $88.23 $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $56.42 $21.15 $77.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $60.91 $27.32 $88.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $60.14 $27.32 $87.46 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $60.91 $27.32 $88.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $45.17 $19.20 $64.37 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $59.46 $27.32 $86.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $60.14 $27.32 $87.46 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $60.91 $27.32 $88.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $59.46 $27.32 $86.78 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $55.68 $27.32 $83.00 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $60.72 $34.15 $94.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PLASTERER $52.50 $20.67 $73.17 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $60.72 $34.15 $94.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: DOZER $59.46 $27.32 $86.78 +128% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $48.01 $16.44 $64.45 Above median +122% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $69.86 $33.39 $103.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $68.89 $33.80 $102.69 Top 10% +170% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $40.98 $18.17 $59.15 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $49.70 $18.62 $68.32 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $55.43 $27.52 $82.95 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $46.71 $8.58 $55.29 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Thurston, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Thurston

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260116-16982-bld →