Heavy Construction — Stevens, Washington

WD WA20260131-16978-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Stevens, Washington (construction type: heavy) is $39.31/hr base + $3.42/hr fringe = $42.73/hr total package (WD WA20260131-16978-hvy, Rev. 2).

Scroll down for all 35 trade classifications covered by this determination.

WD Number: WA20260131-16978-hvy
Revision: 2
Construction Type: heavy
State: Washington (WA)
County: Stevens
Effective: May 17, 2026
Trades covered: 35
Official source: SAM.gov reference WA20260131View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $39.31 $3.42 $42.73 +21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.89 $18.64 $59.53 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.40 $32.77 $76.17 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $36.96 $8.56 $45.52 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $37.01 $0.00 $37.01 Top 10% +34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW CHAIN $36.24 $10.89 $47.13 Above median +71% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FENCE ERECTOR $30.21 $0.00 $30.21 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $35.06 $10.94 $46.00 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $27.51 $2.96 $30.47 Above median +11% vs market $0.00 $0.00 $0.00 $0.00
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $37.55 $0.00 $37.55 Above median +36% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINE PERSON $64.17 $24.54 $88.71 Top 10% +47% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $33.72 $13.15 $46.87 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $31.97 $15.15 $47.12 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $45.93 $19.20 $65.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $33.61 $13.62 $47.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $34.97 $15.31 $50.28 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER PERSON $36.50 $10.16 $46.66 Above median $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 1Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $41.17 $23.40 $64.57 +70% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 2Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $41.56 $23.40 $64.96 +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 3Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $42.31 $23.40 $65.71 +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 4Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $42.51 $23.40 $65.91 +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 5Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $42.71 $23.40 $66.11 +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 6Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $43.05 $23.40 $66.45 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 8Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $45.36 $23.40 $68.76 +81% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: Group 9Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Over $46.34 $23.40 $69.74 +83% vs market $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $34.03 $16.90 $50.93 Top 10% $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER $30.61 $10.89 $41.50 Top 10% $0.00 $0.00 $0.00 $0.00
TREE TRIMMER $42.57 $17.97 $60.54 Top 10% $0.00 $0.00 $0.00 $0.00
TREE TRIMMER: GROUND PERSON $22.60 $16.37 $38.97 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: ASPHALT MIX $55.43 $27.52 $82.95 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $31.24 $18.60 $49.84 Top 10% +63% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $31.62 $16.84 $48.46 Top 10% +58% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Stevens, WA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Stevens

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260131-16978-hvy →