Building Construction — Skamania, Washington

WD WA20260120-14532-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Skamania, Washington (construction type: building) is $49.60/hr base + $25.18/hr fringe = $74.78/hr total package (WD WA20260120-14532-bld, Rev. 1).

Scroll down for all 44 trade classifications covered by this determination.

WD Number: WA20260120-14532-bld
Revision: 1
Construction Type: building
State: Washington (WA)
County: Skamania
Effective: May 17, 2026
Trades covered: 44
Official source: SAM.gov reference WA20260120View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $49.60 $25.18 $74.78 Top 10% +67% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, EXCLUDES FORM WORK $54.69 $16.81 $71.50 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $46.13 $20.31 $66.44 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $54.49 $17.01 $71.50 Top 10% +112% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $63.50 $29.73 $93.23 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
FORM WORKER $29.71 $14.84 $44.55 Top 10% $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $62.02 $22.36 $84.38 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $34.00 $6.48 $40.48 Top 10% +47% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW CHAIN $35.03 $10.86 $45.89 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FIRE WATCH $40.56 $15.60 $56.16 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM STRIPPING $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $31.86 $12.98 $44.84 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $48.14 $15.60 $63.74 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $18.25 $0.00 $18.25 Above median -34% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $44.90 $15.60 $60.50 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $32.17 $11.49 $43.66 Top 10% +59% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $35.85 $7.71 $43.56 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BLADE FINISH $52.55 $17.15 $69.70 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.53 $9.56 $50.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $55.88 $17.15 $73.03 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP $52.92 $22.63 $75.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $55.44 $16.90 $72.34 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $56.42 $21.15 $77.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $52.55 $17.15 $69.70 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $51.31 $17.15 $68.46 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $52.55 $17.15 $69.70 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $40.77 $15.91 $56.68 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $36.39 $16.62 $53.01 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $52.55 $17.15 $69.70 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $42.04 $12.79 $54.83 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $60.72 $34.15 $94.87 Top 10% +150% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $42.47 $19.17 $61.64 Above median +62% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES METAL ROOFS $48.01 $16.44 $64.45 Top 10% +122% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $56.24 $32.72 $88.96 Top 10% $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $51.65 $27.57 $79.22 Above median +108% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $32.68 $16.48 $49.16 Above median +64% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $43.93 $21.81 $65.74 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $55.43 $27.52 $82.95 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $53.84 $27.52 $81.36 Top 10% +165% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Skamania, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.