Building Construction — Pend Oreille, Washington

WD WA20260110-16976-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Pend Oreille, Washington (construction type: building) is $39.57/hr base + $20.50/hr fringe = $60.07/hr total package (WD WA20260110-16976-bld, Rev. 2).

Scroll down for all 37 trade classifications covered by this determination.

WD Number: WA20260110-16976-bld
Revision: 2
Construction Type: building
State: Washington (WA)
County: Pend Oreille
Effective: May 17, 2026
Trades covered: 37
Official source: SAM.gov reference WA20260110View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $39.57 $20.50 $60.07 Above median +34% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.21 $17.28 $61.49 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $40.89 $18.64 $59.53 Above median +72% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $37.46 $18.42 $55.88 Above median +65% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER $44.21 $17.28 $61.49 Top 10% +82% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC $53.78 $22.86 $76.64 Above median +20% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $23.07 $3.99 $27.06 -18% vs market $0.00 $0.00 $0.00 $0.00
HEAT & FROST INSULATOR $75.37 $18.82 $94.19 Top 10% $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.40 $32.77 $76.17 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $37.13 $16.90 $54.03 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: CONCRETE SAW CHAIN $35.03 $10.86 $45.89 Bottom 10% +67% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FIRE WATCH $40.56 $15.60 $56.16 Top 10% +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: FORM STRIPPING $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $40.21 $16.90 $57.11 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: HOD CARRIER $38.05 $16.75 $54.80 +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: JACKHAMMER $51.52 $16.99 $68.51 Top 10% +149% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $29.14 $12.05 $41.19 Above median +50% vs market $0.00 $0.00 $0.00 $0.00
LABORER: NOZZLE PERSON $52.31 $17.01 $69.32 Top 10% +152% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $37.80 $16.90 $54.70 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $43.39 $23.40 $66.79 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $43.05 $23.40 $66.45 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $42.71 $23.40 $66.11 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $40.53 $9.56 $50.09 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP $52.92 $22.63 $75.55 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $56.42 $21.15 $77.57 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: OILER $36.39 $16.62 $53.01 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $65.20 $34.91 $100.11 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $47.15 $27.20 $74.35 Above median +96% vs market $0.00 $0.00 $0.00 $0.00
ROOFER, EXCLUDES METAL ROOFS $35.64 $14.89 $50.53 Above median +74% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $45.83 $27.92 $73.75 Above median $0.00 $0.00 $0.00 $0.00
TILE FINISHER $27.26 $11.99 $39.25 +31% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $36.35 $14.57 $50.92 Above median +70% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: CONCRETE TRUCK $55.43 $27.52 $82.95 Top 10% +171% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $40.22 $20.93 $61.15 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Pend Oreille, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Pend Oreille

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260110-16976-bld →