Building Construction — Okanogan, Washington

WD WA20260035-16975-bld · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Okanogan, Washington (construction type: building) is $33.95/hr base + $19.33/hr fringe = $53.28/hr total package (WD WA20260035-16975-bld, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: WA20260035-16975-bld
Revision: 2
Construction Type: building
State: Washington (WA)
County: Okanogan
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference WA20260035View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $33.95 $19.33 $53.28 +19% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $44.21 $17.28 $61.49 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $46.15 $26.10 $72.25 Above median +56% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $38.05 $16.75 $54.80 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 10 GRADE CHECKER $43.21 $16.90 $60.11 +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER $40.13 $16.90 $57.03 +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER $40.46 $16.90 $57.36 +108% vs market $0.00 $0.00 $0.00 $0.00
METAL BUILDING ERECTOR $11.30 $3.58 $14.88 Top 10% $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.94 $0.00 $27.94 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $33.95 $15.65 $49.60 Above median +76% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $25.17 $4.41 $29.58 +5% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: ROLLER $22.06 $2.72 $24.78 Top 10% -12% vs market $0.00 $0.00 $0.00 $0.00
PIPE INSULATOR/WRAPPER $24.21 $4.07 $28.28 Top 10% $0.00 $0.00 $0.00 $0.00
PIPEFITTER $75.21 $33.88 $109.09 Top 10% +187% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $65.20 $34.91 $100.11 Top 10% +163% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $35.00 $0.00 $35.00 -8% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $35.75 $14.40 $50.15 Above median +73% vs market $0.00 $0.00 $0.00 $0.00
SHEETMETAL WORKER $45.83 $27.92 $73.75 Above median $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.30 $28.58 $72.88 Above median +92% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $29.86 $13.95 $43.81 Above median +46% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER, INCLUDES DUMP TRUCK $23.50 $6.87 $30.37 Top 10% -1% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Okanogan, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Okanogan

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260035-16975-bld →