Building Construction — Mason, Washington

WD WA20260034-16958-bld · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR in Mason, Washington (construction type: building) is $75.37/hr base + $18.82/hr fringe = $94.19/hr total package (WD WA20260034-16958-bld, Rev. 1).

Scroll down for all 29 trade classifications covered by this determination.

WD Number: WA20260034-16958-bld
Revision: 1
Construction Type: building
State: Washington (WA)
County: Mason
Effective: May 17, 2026
Trades covered: 29
Official source: SAM.gov reference WA20260034View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR $75.37 $18.82 $94.19 Top 10% +294% vs market $0.00 $0.00 $0.00 $0.00
BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC $59.88 $27.57 $87.45 $0.00 $0.00 $0.00 $0.00
BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJE $51.52 $16.99 $68.51 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $55.34 $20.05 $75.39 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
DOZER D-10 $60.67 $27.57 $88.24 $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.14 $26.56 $91.70 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $61.14 $23.76 $84.90 Top 10% +156% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $55.39 $22.38 $77.77 Above median +112% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $27.94 $0.00 $27.94 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $41.24 $14.70 $55.94 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: DRYWALL FINISHING/TAPING $29.90 $0.00 $29.90 +6% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: SPRAY $17.80 $4.18 $21.98 -22% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER (MASON COUNTY) $60.72 $34.15 $94.87 +150% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM; EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS $62.47 $27.57 $90.04 +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM $63.35 $27.57 $90.92 +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS $55.43 $27.57 $83.00 +118% vs market $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RES $50.38 $16.96 $67.34 $0.00 $0.00 $0.00 $0.00
ROOFER $44.50 $16.45 $60.95 Above median +110% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $69.86 $33.39 $103.25 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION.$ 24.83 0.00 PLUMBER $35.00 $0.00 $35.00 -22% vs market $0.00 $0.00 $0.00 $0.00
SOFT FLOOR LAYER $42.01 $20.20 $62.21 +162% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $44.13 $26.40 $70.53 Above median +86% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $40.98 $18.17 $59.15 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $49.70 $18.62 $68.32 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $23.50 $6.87 $30.37 Above median -1% vs market $0.00 $0.00 $0.00 $0.00
VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RA $52.31 $17.01 $69.32 Top 10% $0.00 $0.00 $0.00 $0.00
WITH ATTACHMENTS $59.23 $27.57 $86.80 $0.00 $0.00 $0.00 $0.00
WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS $61.56 $27.57 $89.13 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Mason, WA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Mason

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260034-16958-bld →