Heavy Construction — Lincoln, Washington

WD WA20260052-16974-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Lincoln, Washington (construction type: heavy) is $24.03/hr base + $6.50/hr fringe = $30.53/hr total package (WD WA20260052-16974-hvy, Rev. 2).

Scroll down for all 22 trade classifications covered by this determination.

WD Number: WA20260052-16974-hvy
Revision: 2
Construction Type: heavy
State: Washington (WA)
County: Lincoln
Effective: May 17, 2026
Trades covered: 22
Official source: SAM.gov reference WA20260052View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $24.03 $6.50 $30.53 -13% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.21 $0.00 $17.21 -50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.40 $32.77 $76.17 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $38.05 $16.75 $54.80 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-1: GROUP 1 FLAGGER $34.03 $16.90 $50.93 +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-1: GROUP 10 GRADE CHECKER $40.21 $16.90 $57.11 +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-1: GROUP 2 COMMON OR GENERAL LABORER $37.13 $16.90 $54.03 +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS $37.46 $16.90 $54.36 +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.67 $0.00 $14.67 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN $60.54 $24.88 $85.42 Bottom 10% +41% vs market $0.00 $0.00 $0.00 $0.00
PAINTER $36.26 $17.01 $53.27 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT $38.56 $23.40 $61.96 Bottom 10% +63% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER $39.31 $23.40 $62.71 Bottom 10% +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS; OILER; DRILL $39.51 $23.40 $62.91 +65% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE; TRACKHOE/EXCAVATOR; CRANES; DRILLING EQUIPMENT; BOOM TRUCK $39.71 $23.40 $63.11 +66% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE; TRACKHOE/EXCAVATOR; CRANES, BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR; MECHANIC $40.05 $23.40 $63.45 +67% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE; TRACKHOE/EXCAVATOR; CRANES; LOADERS $40.39 $23.40 $63.79 +68% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES; LOADERS $42.36 $23.40 $65.76 +73% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 10 YARD TRUCK $24.61 $8.34 $32.95 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.67 $0.00 $19.67 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.36 $8.30 $32.66 Above median +7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Lincoln, WA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Lincoln

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260052-16974-hvy →