Heavy Construction — Klickitat, Washington

WD WA20260050-14530-hvy · Revision 2 · Effective May 19, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY in Klickitat, Washington (construction type: heavy) is $52.55/hr base + $17.15/hr fringe = $69.70/hr total package (WD WA20260050-14530-hvy, Rev. 2).

Scroll down for all 30 trade classifications covered by this determination.

WD Number: WA20260050-14530-hvy
Revision: 2
Construction Type: heavy
State: Washington (WA)
County: Klickitat
Effective: May 19, 2026
Trades covered: 30
Official source: SAM.gov reference WA20260050View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY $52.55 $17.15 $69.70 $0.00 $0.00 $0.00 $0.00
AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY $55.88 $17.15 $73.03 Above median $0.00 $0.00 $0.00 $0.00
AND ALL JOBS OR PROJECTS LOCATED IN YAMHILL COUNTY, WASHINGTON COUNTY AND COLUMBIA COUNTY AND ALL JOBS OR PORJECTS LOCATED IN CLARK & COWLITZ COUNTY $61.10 $17.15 $78.25 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES FORM WORK $26.43 $7.89 $34.32 Above median -3% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL: ZONE 2 - $0.65 ZONE 3 - $1.15 ZONE 4 - $1.70 ZONE 5 - $3.00 BASE POINTS: BEND, CORVALLIS, EUGENE, M $46.13 $20.31 $66.44 +92% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN: HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING LI $63.50 $29.73 $93.23 +101% vs market $0.00 $0.00 $0.00 $0.00
FENCE ERECTOR $15.00 $0.00 $15.00 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $20.96 $5.50 $26.46 Above median -4% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 2 FLAGGER $40.56 $15.60 $56.16 +104% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 3 MASON TENDER BRICK $44.06 $15.60 $59.66 +117% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 4 CHIPPING GUNS; MASON TENDER-CEMENT/CONCRETE $44.90 $15.60 $60.50 +120% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GROUP 6 GRADE CHECKER; PIPELAYER $46.08 $15.60 $61.68 +124% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.67 $0.00 $14.67 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $61.62 $20.43 $82.05 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE $27.03 $8.20 $35.23 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $27.22 $6.80 $34.02 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $26.31 $8.20 $34.51 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $25.25 $8.20 $33.45 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $25.25 $8.20 $33.45 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $39.94 $16.68 $56.62 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $28.85 $11.55 $40.40 +6% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1- CONCRETE BATCH PLAN AND OR WET MIX THREE UNITS OR MORE; CRANE, FLOATING ONE HUNDRED AND FIFTY TON BUT LESS THAN TWO $58.94 $17.15 $76.09 +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1B- CRANE, THREE HUNDRED TON THROUGH THREE HUNDRED NINETY NINE TON, WITH OVER TWO HUNDRED FOOT BOOM; FLOATING CRANE, T $63.26 $17.15 $80.41 +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2- ASPHALT PLANT; ASPHALT ROTO-MILL, PAVEMENT PROFILER EIGHT FOOT LATERAL CUT AND OVER; AUTO GRADER OR ""TRIMMER""; BL $57.03 $17.15 $74.18 +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6- ASPHALT, PUGMILL; ASPHALT, RAKER; ASPHALT, TRUCK MOUNTED ASPHALT SPREADER, WITH SCREED; AUGER OILER; BOATMAN; BOBCA $48.09 $17.15 $65.24 +71% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 10 YARD TRUCK $24.61 $8.34 $32.95 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.33 $5.81 $25.14 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.36 $8.30 $32.66 Above median +7% vs market $0.00 $0.00 $0.00 $0.00
TUNNEL, POWER JUMBO SETTING SLIP FORMS, ETC. ZONE DIFFERENTIAL: ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLAC $51.31 $17.15 $68.46 $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Klickitat, WA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Klickitat

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260050-14530-hvy →