Residential Construction — King, Washington

WD WA20260091-16962-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICK POINTER/CAULKER/CLEANER in King, Washington (construction type: residential) is $55.34/hr base + $20.05/hr fringe = $75.39/hr total package (WD WA20260091-16962-res, Rev. 1).

Scroll down for all 28 trade classifications covered by this determination.

WD Number: WA20260091-16962-res
Revision: 1
Construction Type: residential
State: Washington (WA)
County: King
Effective: May 17, 2026
Trades covered: 28
Official source: SAM.gov reference WA20260091View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICK POINTER/CAULKER/CLEANER $55.34 $20.05 $75.39 Top 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $55.34 $20.05 $75.39 Top 10% +69% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $24.57 $4.86 $29.43 -16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $54.16 $21.27 $75.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $24.59 $0.00 $24.59 Above median -27% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $35.14 $11.18 $46.32 +0% vs market $0.00 $0.00 $0.00 $0.00
ELEVATOR MECHANIC. FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YE $67.61 $38.44 $106.05 Above median +66% vs market $0.00 $0.00 $0.00 $0.00
FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT $37.56 $20.93 $58.49 Top 10% $0.00 $0.00 $0.00 $0.00
FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT $37.22 $20.93 $58.15 Above median $0.00 $0.00 $0.00 $0.00
FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT $37.02 $20.93 $57.95 Above median $0.00 $0.00 $0.00 $0.00
FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT $36.91 $20.93 $57.84 $0.00 $0.00 $0.00 $0.00
FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS REQUIRED, SHALL BE COMPENSATED AS A PREMIUM, IN ADDITION TO THE CLASSIFICAT $36.58 $20.93 $57.51 Bottom 10% $0.00 $0.00 $0.00 $0.00
GLAZIER $40.28 $16.06 $56.34 +70% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $18.41 $3.20 $21.61 Above median -21% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $50.38 $16.96 $67.34 Top 10% +145% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $38.05 $16.75 $54.80 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $32.74 $15.15 $47.89 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $17.53 $0.00 $17.53 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $29.63 $0.00 $29.63 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CONCRETE PUMP $33.57 $15.15 $48.72 $0.00 $0.00 $0.00 $0.00
PAINTER $53.59 $23.65 $77.24 Top 10% +175% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $20.82 $7.44 $28.26 Above median +0% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $32.25 $7.97 $40.22 +6% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $23.12 $2.90 $26.02 -10% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $52.40 $32.72 $85.12 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER $29.67 $13.78 $43.45 -3% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $46.18 $26.40 $72.58 Above median +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: GROUP 8 TRUCKS, SIDE, END, BOTTOM AND ARTICULATED END DUMP FOOTNOTE A - ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERFIFICATION IS RE $37.88 $20.93 $58.81 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the King, WA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in King

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260091-16962-res →