Residential Construction — Garfield, Washington

WD WA20260084-16971-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Garfield, Washington (construction type: residential) is $17.56/hr base + $0.00/hr fringe = $17.56/hr total package (WD WA20260084-16971-res, Rev. 1).

Scroll down for all 11 trade classifications covered by this determination.

WD Number: WA20260084-16971-res
Revision: 1
Construction Type: residential
State: Washington (WA)
County: Garfield
Effective: May 17, 2026
Trades covered: 11
Official source: SAM.gov reference WA20260084View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $17.56 $0.00 $17.56 -50% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $35.30 $0.00 $35.30 Above median +2% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $19.00 $3.17 $22.17 -52% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $17.34 $0.00 $17.34 Above median -37% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $34.28 $0.00 $34.28 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, AND SPRAY $16.00 $0.00 $16.00 -43% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $26.72 $3.30 $30.02 -21% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $26.11 $0.00 $26.11 -10% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, HVAC DUCT INSTALLATION ONLY $31.63 $24.75 $56.38 +26% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, HVAC DUCT INSTALLATION ONLY $36.66 $27.92 $64.58 +44% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $20.87 $5.22 $26.09 Above median -15% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Garfield, WA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Garfield

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260084-16971-res →