Heavy Construction — Cowlitz, Washington

WD WA20260080-14529-hvy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for $1.00 TO ZONE 1 RATES ZONE 3 - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHE in Cowlitz, Washington (construction type: heavy) is $36.93/hr base + $17.40/hr fringe = $54.33/hr total package (WD WA20260080-14529-hvy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: WA20260080-14529-hvy
Revision: 1
Construction Type: heavy
State: Washington (WA)
County: Cowlitz
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference WA20260080View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
$1.00 TO ZONE 1 RATES ZONE 3 - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHE $36.93 $17.40 $54.33 Top 10% $0.00 $0.00 $0.00 $0.00
$1.30 TO ZONE 1 RATES BASEPOINTS: TACOMA, OLYMPIA, AND CENTRALIA $64.11 $27.32 $91.43 Top 10% $0.00 $0.00 $0.00 $0.00
1 RATES ZONE 3 - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTO $38.39 $17.40 $55.79 Top 10% $0.00 $0.00 $0.00 $0.00
AND CENTRALIA $62.32 $27.32 $89.64 Top 10% $0.00 $0.00 $0.00 $0.00
AND CENTRALIA $59.96 $27.32 $87.28 Bottom 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT ENGINEER ZONE A $53.31 $16.70 $70.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT ENGINEER ZONE B $56.31 $16.70 $73.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT ENGINEER ZONE C $59.31 $16.70 $76.01 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT MATE ZONE A $47.95 $16.70 $64.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: ASSISTANT MATE ZONE B $50.95 $16.70 $67.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE C $62.47 $16.70 $79.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE DREDGING: ASSISTANT MATE ZONE C $53.95 $16.70 $70.65 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE A $56.47 $16.70 $73.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE DREDGING: LEVERMAN, DIPPER, FLOATING CLAMSHELL ZONE B $59.47 $16.70 $76.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE A $56.47 $16.70 $73.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE B $59.47 $16.70 $76.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: LEVERMAN, HYDRAULIC ZONE C $62.47 $16.70 $79.17 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE A $51.82 $16.70 $68.52 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE B $54.82 $16.70 $71.52 Top 10% $0.00 $0.00 $0.00 $0.00
DREDGING: TENDERMAN ZONE C $57.82 $16.70 $74.52 Top 10% $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $31.56 $20.65 $52.21 Top 10% $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $31.29 $20.65 $51.94 Above median $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $31.01 $20.65 $51.66 Above median $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $30.85 $20.65 $51.50 Above median $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $30.69 $20.65 $51.34 $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $30.08 $20.65 $50.73 $0.00 $0.00 $0.00 $0.00
HYDRAULIC DREDGES) $29.76 $20.65 $50.41 Bottom 10% $0.00 $0.00 $0.00 $0.00
MILES) - ADD $1.00 TO ZONE 1 RATES ZONE 3 - ADD $1.30 TO ZONE 1 RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND $37.35 $17.40 $54.75 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ASSISTANT ENGINEER; MATES & BOATMEN ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 - ADD $1.00 TO ZONE 1 RATES ZONE 3 - ADD $1 $60.63 $27.32 $87.95 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: ENGINNER WELDER (LEWIS, PACIFIC, AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 - ADD $1.00 TO ZONE 1 R $62.32 $27.32 $89.64 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: LEVERMAN, HYDRAULIC (LEWIS, PACIFIC, AND THURSTON COUNTIES) ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 - ADD $1.00 TO ZONE $64.11 $27.32 $91.43 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: OILER; ASSISTANT MATE ZONE 1 (0-25 RADIUS MILES - BASE RATE ZONE 2 - ADD $1.00 TO ZONE 1 RATES ZONE 3 - ADD $1.30 TO ZONE 1 $59.96 $27.32 $87.28 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
RATES BASEPOINTS: KENT, EVERETT, MT. VERNON, BELLINGHAM, PORT ANGELES, PORT TOWNSEND, ABERDEEN, SHELTON, BREMERTON, WENATCHEE, AND YAKIMA.$ 36.93 17.4 $35.93 $17.40 $53.33 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Cowlitz, WA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Cowlitz

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260080-14529-hvy →