Highway Construction — Columbia, Washington
WD WA20260001-16968-hwy · Revision 3 · Effective May 19, 2026
The Davis-Bacon prevailing wage for (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) in Columbia, Washington (construction type: highway) is $43.39/hr base + $23.40/hr fringe = $66.79/hr total package (WD WA20260001-16968-hwy, Rev. 3).
Scroll down for all 174 trade classifications covered by this determination.
Prevailing Wage Rates — All Trades
Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.
| Trade Classification | Base $/hr | Fringe $/hr | Total Package | H&W | Pension | Vacation | Training |
|---|---|---|---|---|---|---|---|
| (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) | $43.39 | $23.40 | $66.79 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) | $43.05 | $23.40 | $66.45 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) | $42.71 | $23.40 | $66.11 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) | $42.51 | $23.40 | $65.91 | $0.00 | $0.00 | $0.00 | $0.00 |
| (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) | $41.17 | $23.40 | $64.57 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $46.08 | $15.60 | $61.68 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $45.54 | $15.60 | $61.14 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $44.90 | $15.60 | $60.50 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $44.06 | $15.60 | $59.66 | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $40.56 | $15.60 | $56.16 | $0.00 | $0.00 | $0.00 | $0.00 |
| (CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) | $32.67 | $15.60 | $48.27 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $58.24 | $17.28 | $75.52 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $34.18 | $17.63 | $51.81 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| 4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $33.97 | $17.63 | $51.60 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $33.72 | $17.63 | $51.35 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $33.40 | $17.63 | $51.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $33.09 | $17.63 | $50.72 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BEARING SURFACE EITHER MOUNTED OR PULLED, UP TO 14 TON); VACUUM TRUCK.. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, L | $37.02 | $20.93 | $57.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| BRIDGE CARPENTER | $65.58 | $19.13 | $84.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $83.56 | $33.71 | $117.27 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $44.22 | $21.50 | $65.72 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $34.10 | $16.68 | $50.78 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $71.65 | $26.76 | $98.41 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $63.00 | $27.87 | $90.87 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $44.23 | $17.73 | $61.96 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER | $40.82 | $17.63 | $58.45 | $0.00 | $0.00 | $0.00 | $0.00 |
| CABLE SPLICER. HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING | $44.22 | $21.50 | $65.72 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER | $63.98 | $19.13 | $83.11 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: BRIDGE CARPENTER | $65.58 | $19.13 | $84.71 Top 10% +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTER | $63.98 | $19.13 | $83.11 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: CARPENTER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHEST R | $59.35 | $22.38 | $81.73 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: DIVER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHEST RATE | $125.44 | $19.13 | $144.57 Top 10% +310% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: DIVER TENDER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHES | $71.77 | $19.13 | $90.90 Top 10% +158% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: DIVER TENDER..$ 71.77 19.13 CARPENTER: DIVER | $125.44 | $19.13 | $144.57 Top 10% +310% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTER: PILEDRIVER: INCLUDES DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING, OR CREOSOTE TREATED MATERIAL, ON ALL PILING EMPLOYEES MA | $49.76 | $17.28 | $67.04 Top 10% +38% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS | $54.69 | $16.81 | $71.50 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: CARPENTERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNT | $54.69 | $16.81 | $71.50 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DIVERS | $108.33 | $16.81 | $125.14 Top 10% +255% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DIVERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WE | $108.33 | $16.81 | $125.14 Top 10% +255% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DIVERS TENDERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM C | $64.32 | $16.81 | $81.13 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DIVERS TENDERS EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIG | $64.32 | $16.81 | $81.13 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DRYWALL | $54.59 | $16.81 | $71.40 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CARPENTERS: DRYWALL (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY W | $54.59 | $16.81 | $71.40 Top 10% +103% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: CEMENT MASON | $54.24 | $17.28 | $71.52 Bottom 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: CEMENT MASON | $54.16 | $21.27 | $75.43 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD ZONE DIFFERENTIAL: ZONE 2 - $0.65 ZONE 3 - 1.15 ZONE 4 - 1.70 ZONE 5 - 3.00 | $61.62 | $20.43 | $82.05 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: COMPOSITION, TROWEL MCHINE, GRINDER, POWER TOOLS, GUNNITE NOZZLE | $54.66 | $21.27 | $75.93 Top 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: TROWELING MACHINE OPERATOR ON COMPOSITION | $55.39 | $22.38 | $77.77 Top 10% +125% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CEMENT MASON: TROWELING MACHINE OPERATOR ON COMPOSITION | $54.66 | $21.27 | $75.93 Bottom 10% +120% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER. ZONE 1: PROJECTS WITHIN 30 MILES OF THE RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 | $47.09 | $20.31 | $67.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $63.50 | $29.73 | $93.23 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $49.55 | $19.09 | $68.64 Above median +48% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $65.14 | $26.56 | $91.70 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $53.20 | $27.51 | $80.71 Top 10% +74% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| ELECTRICIAN | $42.45 | $21.34 | $63.79 Above median +37% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| HOD CARRIER | $50.76 | $17.28 | $68.04 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| HOD CARRIER | $38.05 | $16.75 | $54.80 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $43.40 | $32.77 | $76.17 Above median +49% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER | $48.31 | $34.52 | $82.83 Above median +63% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| IRONWORKER..$ 55.24 17.28 IRONWORKER | $48.21 | $17.28 | $65.49 Top 10% +29% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-1 AREA: GROUP 1- FLAGMAN; LANDSCAPE LABORER; SCALEMAN; TRAFFIC CONTROL MAINTENANCE LABORER; WINDOW WASHER/CLEANER | $34.03 | $16.90 | $50.93 Top 10% +85% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-1 AREA: GROUP 2-ASBESTOS ABATEMENT WORKER; BRUSH HOG FEEDER; CARPENTER TENDER; CEMENT HANDLER; CLEAN-UP LABORER; CONCRETE CREWMAN; CONFINED | $37.13 | $16.90 | $54.03 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-1 AREA: GROUP 3- ASPHALT FOLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMEN, NON-MECHANICAL | $37.46 | $16.90 | $54.36 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-1: GROUP 5-DRILLS WITH DUAL MASTS ; HAZARDOUS WASTER WORKER, LEVEL A; MINER CLASS ""D"" | $38.14 | $16.90 | $55.04 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-2 AREA: GROUP 1- FLAGMAN; LANDSCAPE LABORER; SCALEMAN; TRAFFIC CONTROL MAINTENANCE LABORER; WINDOW WASHER/CLEANER. (A-2 AREA: ADAMS,COLUMBI | $37.03 | $16.90 | $53.93 Top 10% +96% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-2 AREA: GROUP 3- ASPHALT FOLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMEN, NON-MECHANICAL | $40.46 | $16.90 | $57.36 Top 10% +108% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LABORER, A-2 AREA: GROUP 5-DRILLS WITH DUAL MASTS ; HAZARDOUS WASTER WORKER, LEVEL A; MINER CLASS ""D"". (A-2 AREA: ADAMS,COLUMBIA,DOUGLAS, FERRY, GRA | $41.14 | $16.90 | $58.04 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| LEWISTON. ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING O | $37.88 | $20.93 | $58.81 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| LEWISTON. ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING O | $40.02 | $20.93 | $60.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI | $61.93 | $27.57 | $89.50 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI | $61.47 | $27.57 | $89.04 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI | $60.93 | $27.57 | $88.50 | $0.00 | $0.00 | $0.00 | $0.00 |
| MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI | $60.67 | $27.57 | $88.24 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI | $61.14 | $27.57 | $88.71 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI | $60.69 | $27.57 | $88.26 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI | $60.14 | $27.57 | $87.71 | $0.00 | $0.00 | $0.00 | $0.00 |
| MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI | $59.88 | $27.57 | $87.45 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OF MACHINE AND NOZZLE); HAZARDOUS WASTE WORKER, LEVEL B; HIGH SCALER; LASER BEAM OPERATOR; MINER, CLASS C; MONITOR OPERATOR; MORTAR MIXER, NOZZLEMAN | $40.80 | $16.90 | $57.70 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OF MACHINE AND NOZZLE); HAZARDOUS WASTE WORKER, LEVEL B; HIGH SCALER; LASER BEAM OPERATOR; MINER, CLASS C; MONITOR OPERATOR; MORTAR MIXER, NOZZLEMAN | $37.80 | $16.90 | $54.70 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED | $37.56 | $20.93 | $58.49 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED | $33.83 | $20.93 | $54.76 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED | $40.88 | $20.93 | $61.81 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| OREILLE, AND STEVENS COUNTIES) | $40.13 | $16.90 | $57.03 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: APPLICATION OF COLD TAR PRODUCTS, EPOXIES, POLYURETHANES, ACIDS, RADIATION RESISTANT MATERIAL, WATER, SANDBLASTING, OVER 30'/SWING STAGE WORK | $36.26 | $17.01 | $53.27 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, SPRAY & SANDBLASTING | $110.48 | $17.28 | $127.76 Top 10% +354% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTER: BRUSH, ROLLER, SPRAY & SANDBLASTING | $39.94 | $16.68 | $56.62 Bottom 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: HIGHWAY & PARKING LOT STRIPER | $41.19 | $17.09 | $58.28 Top 10% +107% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PAINTERS: STRIPERS | $41.80 | $20.85 | $62.65 Top 10% +123% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER | $65.53 | $19.13 | $84.66 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| PILEDRIVER (CLARK, COWLITZ, *PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES *PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH | $56.06 | $16.81 | $72.87 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $58.94 | $17.15 | $76.09 Top 10% +100% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA | $60.32 | $27.32 | $87.64 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS | $61.41 | $27.32 | $88.73 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU | $60.91 | $27.32 | $88.23 Top 10% +132% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1A (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $61.10 | $17.15 | $78.25 Top 10% +106% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1A (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE B | $61.22 | $27.32 | $88.54 Top 10% +133% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1A (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS | $62.32 | $27.32 | $89.64 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1A (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PL | $61.81 | $27.32 | $89.13 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AA (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE | $62.12 | $27.32 | $89.44 Top 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AA (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU | $63.22 | $27.32 | $90.54 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE P | $62.71 | $27.32 | $90.03 Top 10% +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AA: CRANES: 200 TONS- 299 TONS, OR 250 OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TON | $62.47 | $27.57 | $90.04 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AAA (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE | $62.99 | $27.32 | $90.31 Top 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AAA (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PL | $64.11 | $27.32 | $91.43 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE | $63.59 | $27.32 | $90.91 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1AAA: CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW | $63.35 | $27.57 | $90.92 Top 10% +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 1B (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $63.26 | $17.15 | $80.41 Top 10% +111% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $57.03 | $17.15 | $74.18 Top 10% +95% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA | $59.56 | $27.32 | $86.88 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS | $60.63 | $27.32 | $87.95 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 2 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU | $60.14 | $27.32 | $87.46 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $55.88 | $17.15 | $73.03 Top 10% +92% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA | $58.89 | $27.32 | $86.21 Top 10% +126% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS | $59.96 | $27.32 | $87.28 Top 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 3 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU | $59.46 | $27.32 | $86.78 Top 10% +128% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $52.55 | $17.15 | $69.70 Top 10% +83% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA | $55.13 | $27.32 | $82.45 Top 10% +117% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS | $56.15 | $27.32 | $83.47 Top 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 4 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU | $55.68 | $27.32 | $83.00 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 5 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $51.31 | $17.15 | $68.46 Top 10% +80% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR GROUP 6 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) | $48.09 | $17.15 | $65.24 Top 10% +71% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW | $62.85 | $27.57 | $90.42 Top 10% +138% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW | $62.39 | $27.57 | $89.96 Above median +136% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW | $61.83 | $27.57 | $89.40 Bottom 10% +135% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1A: CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TO | $61.56 | $27.57 | $89.13 Top 10% +134% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO | $63.75 | $27.57 | $91.32 Top 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO | $63.29 | $27.57 | $90.86 Above median +139% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO | $62.73 | $27.57 | $90.30 Bottom 10% +137% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW | $64.66 | $27.57 | $92.23 Top 10% +142% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW | $64.19 | $27.57 | $91.76 Above median +141% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW | $63.62 | $27.57 | $91.19 Bottom 10% +140% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE | $60.02 | $27.57 | $87.59 Top 10% +130% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE | $59.49 | $27.57 | $87.06 Bottom 10% +129% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND | $60.46 | $27.57 | $88.03 Top 10% +131% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND | $55.68 | $27.57 | $83.25 Bottom 10% +119% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| POWER EQUIPMENT OPERATOR: GROUP 4: ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND | $55.43 | $27.57 | $83.00 Top 10% +118% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40 MILES FROM THE RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MIL | $34.42 | $17.63 | $52.05 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40 MILES FROM THE RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MIL | $33.24 | $17.63 | $50.87 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MIL | $44.21 | $17.28 | $61.49 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILESE FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MI | $47.09 | $20.31 | $67.40 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILESE FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MI | $46.13 | $20.31 | $66.44 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL | $48.05 | $20.31 | $68.36 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHIPPING & RECEIVING); WRECKER AND TOW TRUCK. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, LEWISTON. ZONE 1: 0-45 RADI | $39.58 | $20.93 | $60.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| SHIPPING & RECEIVING); WRECKER AND TOW TRUCK.. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, LEWISTON. ZONE 1: 0-45 RAD | $36.58 | $20.93 | $57.51 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS; DOZERS: D-9 & UNDER; DRILL OILERS: AUGER TYPE, TRUCK O | $59.23 | $27.57 | $86.80 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 1: GROUP 1- ESCORT DRIVER OR PILOT CAR; EMPLOYEE HAUL; POWER BOAT HAULING EMPLOYEES OR MATERIAL. ZONE DIFFERENTIALS-ADD TO ZONE 1 | $36.83 | $20.93 | $57.76 Top 10% +88% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 1: GROUP 2- FISH TRUCK; FLAT BED TRUCK; FORK LIFT; LEVERPERSON; TRAILER MOUNTED HYDRO SEEDER AND MULCHER; SEEDER & MULCHER; STATIO | $39.47 | $20.93 | $60.40 Top 10% +97% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 1: GROUP 4- A-FRAME; BURNER, CUTTER, & WELDER; SERVICE GREASER; TRUCKS, SIDE, END, BOTTOM & ARTIFULCATED END DUMP; TRUCK MOUNTED H | $39.91 | $20.93 | $60.84 Top 10% +98% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 1: GROUP 6- FLAHERTY SPREADER BOX DRIVER; FLOWBOYS; FORK LIFT; DUMPS; MECHANIC; SEMI-END DUMPS; TRANSFER TRUCK & TRAILER; TRANSIT | $40.22 | $20.93 | $61.15 Top 10% +99% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 1: GROUP 7- OIL DISTRIBUTOR DRIVER; STRINGER TRUCK; TRANSIT MIXERS & TRUCKS HAULING CONCRETE; TRUCK, SIDE, END, BOTTOM END DUMP; T | $40.56 | $20.93 | $61.49 Top 10% +101% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 2: GROUP 2- FISH TRUCK; FLAT BED TRUCK; FORK LIFT; LEVERPERSON; TRAILER MOUNTED HYDRO SEEDER AND MULCHER; SEEDER & MULCHER; STATIO | $36.47 | $20.93 | $57.40 Top 10% +87% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 2: GROUP 4- A-FRAME; BURNER, CUTTER, & WELDER; SERVICE GREASER; TRUCKS, SIDE, END, BOTTOM & ARTIFULCATED END DUMP; TRUCK MOUNTED H | $36.91 | $20.93 | $57.84 Top 10% +89% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| TRUCK DRIVERS: AREA 2: GROUP 6- FLAHERTY SPREADER BOX DRIVER; FLOWBOYS; FORK LIFT; DUMPS; MECHANIC; SEMI-END DUMPS; TRANSFER TRUCK & TRAILER; TRANSIT | $37.22 | $20.93 | $58.15 Top 10% +90% vs market | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $53.99 | $17.05 | $71.04 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $52.31 | $17.01 | $69.32 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $50.38 | $16.96 | $67.34 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $40.88 | $16.72 | $57.60 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $36.07 | $15.79 | $51.86 | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $51.52 | $16.99 | $68.51 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $39.89 | $16.70 | $56.59 | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $39.26 | $16.68 | $55.94 | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $38.40 | $16.66 | $55.06 | $0.00 | $0.00 | $0.00 | $0.00 |
| WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY | $31.19 | $16.48 | $47.67 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| YAKIMA COUNTIES) | $45.36 | $23.40 | $68.76 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| YAKIMA COUNTIES) | $42.31 | $23.40 | $65.71 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| YAKIMA COUNTIES) | $41.56 | $23.40 | $64.96 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO | $54.98 | $27.52 | $82.50 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO | $46.81 | $27.52 | $74.33 Bottom 10% | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO | $51.78 | $27.52 | $79.30 | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO | $54.59 | $27.52 | $82.11 Above median | $0.00 | $0.00 | $0.00 | $0.00 |
| ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO | $55.43 | $27.52 | $82.95 Top 10% | $0.00 | $0.00 | $0.00 | $0.00 |
Crew Labor Cost Estimator
Estimate total federal-contract labor cost using the Columbia, WA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.
| Trade | Workers | Hours/worker | Rate $/hr | Subtotal |
|---|
This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.
Other Construction Types in Columbia
Compliance Notes
- This wage determination applies to federal contracts for highway construction in Columbia, Washington.
- The Davis-Bacon Act applies to contracts ≥$2,000 involving construction, alteration, or repair of federal or federally assisted buildings.
- The total package (base + fringe) is the minimum hourly labor cost per worker. Employers may satisfy fringe requirements by contributing to bona fide benefit plans.
- Apprentices must be registered with a DOL-approved apprenticeship program to be paid apprentice rates.
- Contractors must post this wage determination at the job site. Certified payroll records must be submitted weekly using Form WH-347.
- If a trade classification you need isn't listed below, request a conformance from the DOL Wage and Hour Division.