Highway Construction — Columbia, Washington

WD WA20260001-16968-hwy · Revision 3 · Effective May 19, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for (ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) in Columbia, Washington (construction type: highway) is $43.39/hr base + $23.40/hr fringe = $66.79/hr total package (WD WA20260001-16968-hwy, Rev. 3).

Scroll down for all 174 trade classifications covered by this determination.

WD Number: WA20260001-16968-hwy
Revision: 3
Construction Type: highway
State: Washington (WA)
County: Columbia
Effective: May 19, 2026
Trades covered: 174
Official source: SAM.gov reference WA20260001View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
(ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) $43.39 $23.40 $66.79 Top 10% $0.00 $0.00 $0.00 $0.00
(ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) $43.05 $23.40 $66.45 Above median $0.00 $0.00 $0.00 $0.00
(ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) $42.71 $23.40 $66.11 Above median $0.00 $0.00 $0.00 $0.00
(ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) $42.51 $23.40 $65.91 $0.00 $0.00 $0.00 $0.00
(ADAMS, CHELAN, COLUMBIA, DOUGLAS, FERRY, GRANT, OKANOGAN, PEND OREILLE, STEVENS, AND YAKIMA COUNTIES) $41.17 $23.40 $64.57 Bottom 10% $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $46.08 $15.60 $61.68 Top 10% $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $45.54 $15.60 $61.14 Above median $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $44.90 $15.60 $60.50 Above median $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $44.06 $15.60 $59.66 $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $40.56 $15.60 $56.16 $0.00 $0.00 $0.00 $0.00
(CLARK, COWLITZ, KLICKITAT, PACIFIC, SKAMANIA AND WAHKIAKUM COUNTIES) $32.67 $15.60 $48.27 Bottom 10% $0.00 $0.00 $0.00 $0.00
4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $58.24 $17.28 $75.52 Top 10% $0.00 $0.00 $0.00 $0.00
4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $34.18 $17.63 $51.81 Above median $0.00 $0.00 $0.00 $0.00
4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $33.97 $17.63 $51.60 $0.00 $0.00 $0.00 $0.00
4: MORE THAN 50 MILES BUT LESS THAN 80 MILES FROM THE RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $33.72 $17.63 $51.35 Bottom 10% $0.00 $0.00 $0.00 $0.00
5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $33.40 $17.63 $51.03 Top 10% $0.00 $0.00 $0.00 $0.00
5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $33.09 $17.63 $50.72 Bottom 10% $0.00 $0.00 $0.00 $0.00
BEARING SURFACE EITHER MOUNTED OR PULLED, UP TO 14 TON); VACUUM TRUCK.. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, L $37.02 $20.93 $57.95 Top 10% $0.00 $0.00 $0.00 $0.00
BRIDGE CARPENTER $65.58 $19.13 $84.71 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $83.56 $33.71 $117.27 Top 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $44.22 $21.50 $65.72 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $34.10 $16.68 $50.78 Bottom 10% $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $71.65 $26.76 $98.41 Above median $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $63.00 $27.87 $90.87 Above median $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $44.23 $17.73 $61.96 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER $40.82 $17.63 $58.45 $0.00 $0.00 $0.00 $0.00
CABLE SPLICER. HOURLY ZONE PAY: HOURLY ZONE PAY SHALL BE PAID ON JOBS LOCATED OUTSIDE OF THE FREE ZONE COMPUTED FROM THE CITY CENTER OF THE FOLLOWING $44.22 $21.50 $65.72 Top 10% $0.00 $0.00 $0.00 $0.00
CARPENTER $63.98 $19.13 $83.11 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: BRIDGE CARPENTER $65.58 $19.13 $84.71 Top 10% +141% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER $63.98 $19.13 $83.11 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: CARPENTER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHEST R $59.35 $22.38 $81.73 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: DIVER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHEST RATE $125.44 $19.13 $144.57 Top 10% +310% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: DIVER TENDER EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIGHES $71.77 $19.13 $90.90 Top 10% +158% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: DIVER TENDER..$ 71.77 19.13 CARPENTER: DIVER $125.44 $19.13 $144.57 Top 10% +310% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER: PILEDRIVER: INCLUDES DRIVING, PULLING, CUTTING, PLACING COLLARS, SETTING, WELDING, OR CREOSOTE TREATED MATERIAL, ON ALL PILING EMPLOYEES MA $49.76 $17.28 $67.04 Top 10% +38% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS $54.69 $16.81 $71.50 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: CARPENTERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNT $54.69 $16.81 $71.50 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS $108.33 $16.81 $125.14 Top 10% +255% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY WE $108.33 $16.81 $125.14 Top 10% +255% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS TENDERS (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM C $64.32 $16.81 $81.13 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DIVERS TENDERS EMPLOYEES MAY BE REQUIRED TO PERFORM ANY COMBINATION OF WORK WITHIN THE DIVING TEAM/CREW, PROVIDED THEY ARE PAID AT THE HIG $64.32 $16.81 $81.13 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DRYWALL $54.59 $16.81 $71.40 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CARPENTERS: DRYWALL (PACIFIC COUNTY PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH BOUNDARY LINE OF WAHKIAKUM COUNTY W $54.59 $16.81 $71.40 Top 10% +103% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: CEMENT MASON $54.24 $17.28 $71.52 Bottom 10% +107% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: CEMENT MASON $54.16 $21.27 $75.43 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: CEMENT MASONS ON SUSPENDED, SWINGING AND/OR HANGING SCAFFOLD ZONE DIFFERENTIAL: ZONE 2 - $0.65 ZONE 3 - 1.15 ZONE 4 - 1.70 ZONE 5 - 3.00 $61.62 $20.43 $82.05 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: COMPOSITION, TROWEL MCHINE, GRINDER, POWER TOOLS, GUNNITE NOZZLE $54.66 $21.27 $75.93 Top 10% +120% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: TROWELING MACHINE OPERATOR ON COMPOSITION $55.39 $22.38 $77.77 Top 10% +125% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON: TROWELING MACHINE OPERATOR ON COMPOSITION $54.66 $21.27 $75.93 Bottom 10% +120% vs market $0.00 $0.00 $0.00 $0.00
CORVALLIS, EUGENE, MEDFORD, PORTLAND, SALEM, THE DALLES, VANCOUVER. ZONE 1: PROJECTS WITHIN 30 MILES OF THE RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 $47.09 $20.31 $67.40 Top 10% $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $75.96 $33.48 $109.44 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $63.50 $29.73 $93.23 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $65.14 $26.56 $91.70 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $60.00 $27.78 $87.78 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $53.20 $27.51 $80.71 Top 10% +74% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $42.45 $21.34 $63.79 Above median +37% vs market $0.00 $0.00 $0.00 $0.00
HOD CARRIER $50.76 $17.28 $68.04 Top 10% $0.00 $0.00 $0.00 $0.00
HOD CARRIER $38.05 $16.75 $54.80 Above median $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.40 $32.77 $76.17 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $48.31 $34.52 $82.83 Above median +63% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER..$ 55.24 17.28 IRONWORKER $48.21 $17.28 $65.49 Top 10% +29% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-1 AREA: GROUP 1- FLAGMAN; LANDSCAPE LABORER; SCALEMAN; TRAFFIC CONTROL MAINTENANCE LABORER; WINDOW WASHER/CLEANER $34.03 $16.90 $50.93 Top 10% +85% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-1 AREA: GROUP 2-ASBESTOS ABATEMENT WORKER; BRUSH HOG FEEDER; CARPENTER TENDER; CEMENT HANDLER; CLEAN-UP LABORER; CONCRETE CREWMAN; CONFINED $37.13 $16.90 $54.03 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-1 AREA: GROUP 3- ASPHALT FOLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMEN, NON-MECHANICAL $37.46 $16.90 $54.36 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-1: GROUP 5-DRILLS WITH DUAL MASTS ; HAZARDOUS WASTER WORKER, LEVEL A; MINER CLASS ""D"" $38.14 $16.90 $55.04 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-2 AREA: GROUP 1- FLAGMAN; LANDSCAPE LABORER; SCALEMAN; TRAFFIC CONTROL MAINTENANCE LABORER; WINDOW WASHER/CLEANER. (A-2 AREA: ADAMS,COLUMBI $37.03 $16.90 $53.93 Top 10% +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-2 AREA: GROUP 3- ASPHALT FOLLER, WALKING; CEMENT FINISHER TENDER; CONCRETE SAW, WALKING; DEMOLITION TORCH; DOPE POT FIREMEN, NON-MECHANICAL $40.46 $16.90 $57.36 Top 10% +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER, A-2 AREA: GROUP 5-DRILLS WITH DUAL MASTS ; HAZARDOUS WASTER WORKER, LEVEL A; MINER CLASS ""D"". (A-2 AREA: ADAMS,COLUMBIA,DOUGLAS, FERRY, GRA $41.14 $16.90 $58.04 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
LEWISTON. ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING O $37.88 $20.93 $58.81 Bottom 10% $0.00 $0.00 $0.00 $0.00
LEWISTON. ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING O $40.02 $20.93 $60.95 Top 10% $0.00 $0.00 $0.00 $0.00
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI $61.93 $27.57 $89.50 Top 10% $0.00 $0.00 $0.00 $0.00
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI $61.47 $27.57 $89.04 Above median $0.00 $0.00 $0.00 $0.00
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI $60.93 $27.57 $88.50 $0.00 $0.00 $0.00 $0.00
MACHINE, MOLE, TUNNEL DRILL, BORING, ROAD HEADER AND/OR SHIELD; QUAD 9, HD 41, D10 AND OVER; REMOTE CONTROL OPERATOR ON RUBBER TIRED EARTH MOVING EQUI $60.67 $27.57 $88.24 Bottom 10% $0.00 $0.00 $0.00 $0.00
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI $61.14 $27.57 $88.71 Top 10% $0.00 $0.00 $0.00 $0.00
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI $60.69 $27.57 $88.26 Above median $0.00 $0.00 $0.00 $0.00
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI $60.14 $27.57 $87.71 $0.00 $0.00 $0.00 $0.00
MOUNT WITH BOOM ATTACHMENT UP TO 42M; CRUSHER; DECK ENGINEER/DECK WINCHES; GRADE ENGINEER: USING BLUE PRINTS, CUT SHEETS, ETC.; -FINISHING MACHINE: BI $59.88 $27.57 $87.45 Bottom 10% $0.00 $0.00 $0.00 $0.00
OF MACHINE AND NOZZLE); HAZARDOUS WASTE WORKER, LEVEL B; HIGH SCALER; LASER BEAM OPERATOR; MINER, CLASS C; MONITOR OPERATOR; MORTAR MIXER, NOZZLEMAN $40.80 $16.90 $57.70 Top 10% $0.00 $0.00 $0.00 $0.00
OF MACHINE AND NOZZLE); HAZARDOUS WASTE WORKER, LEVEL B; HIGH SCALER; LASER BEAM OPERATOR; MINER, CLASS C; MONITOR OPERATOR; MORTAR MIXER, NOZZLEMAN $37.80 $16.90 $54.70 Bottom 10% $0.00 $0.00 $0.00 $0.00
OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE $40.89 $18.64 $59.53 Top 10% $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED $37.56 $20.93 $58.49 Above median $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED $33.83 $20.93 $54.76 Bottom 10% $0.00 $0.00 $0.00 $0.00
OFFICE. ZONE 2: OUTSIDE 45 RADIUS MILES FROM THE MAIN POST OFFICE. FOOTNOTE A: ANYONE WORKING ON A HAZMAT JOB, WHERE HAZMAT CERTIFICATION IS REQUIRED $40.88 $20.93 $61.81 Top 10% $0.00 $0.00 $0.00 $0.00
OREILLE, AND STEVENS COUNTIES) $40.13 $16.90 $57.03 Top 10% $0.00 $0.00 $0.00 $0.00
PAINTER: APPLICATION OF COLD TAR PRODUCTS, EPOXIES, POLYURETHANES, ACIDS, RADIATION RESISTANT MATERIAL, WATER, SANDBLASTING, OVER 30'/SWING STAGE WORK $36.26 $17.01 $53.27 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY & SANDBLASTING $110.48 $17.28 $127.76 Top 10% +354% vs market $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER, SPRAY & SANDBLASTING $39.94 $16.68 $56.62 Bottom 10% +101% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: HIGHWAY & PARKING LOT STRIPER $41.19 $17.09 $58.28 Top 10% +107% vs market $0.00 $0.00 $0.00 $0.00
PAINTERS: STRIPERS $41.80 $20.85 $62.65 Top 10% +123% vs market $0.00 $0.00 $0.00 $0.00
PILEDRIVER $65.53 $19.13 $84.66 Top 10% $0.00 $0.00 $0.00 $0.00
PILEDRIVER (CLARK, COWLITZ, *PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES *PORTION OF PACIFIC COUNTY SOUTH OF A STRAIGHT LINE MADE BY EXTENDING THE NORTH $56.06 $16.81 $72.87 Top 10% $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $58.94 $17.15 $76.09 Top 10% +100% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA $60.32 $27.32 $87.64 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS $61.41 $27.32 $88.73 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU $60.91 $27.32 $88.23 Top 10% +132% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $61.10 $17.15 $78.25 Top 10% +106% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE B $61.22 $27.32 $88.54 Top 10% +133% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS $62.32 $27.32 $89.64 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1A (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PL $61.81 $27.32 $89.13 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AA (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE $62.12 $27.32 $89.44 Top 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AA (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU $63.22 $27.32 $90.54 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE P $62.71 $27.32 $90.03 Top 10% +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AA: CRANES: 200 TONS- 299 TONS, OR 250 OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TON $62.47 $27.57 $90.04 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AAA (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE $62.99 $27.32 $90.31 Top 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AAA (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PL $64.11 $27.32 $91.43 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AAA (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE $63.59 $27.32 $90.91 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1AAA: CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW $63.35 $27.57 $90.92 Top 10% +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 1B (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $63.26 $17.15 $80.41 Top 10% +111% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $57.03 $17.15 $74.18 Top 10% +95% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA $59.56 $27.32 $86.88 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS $60.63 $27.32 $87.95 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 2 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU $60.14 $27.32 $87.46 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $55.88 $17.15 $73.03 Top 10% +92% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA $58.89 $27.32 $86.21 Top 10% +126% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS $59.96 $27.32 $87.28 Top 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 3 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU $59.46 $27.32 $86.78 Top 10% +128% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $52.55 $17.15 $69.70 Top 10% +83% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 (LEWIS AND PACIFIC COUNTIES ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BA $55.13 $27.32 $82.45 Top 10% +117% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 (PIERCE COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLUS $56.15 $27.32 $83.47 Top 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 4 (THURSTON COUNTY ON PROJECTS DESCRIBED IN FOOTNOTE A BELOW, THE RATE FOR EACH GROUP SHALL BE 90% OF THE BASE RATE PLU $55.68 $27.32 $83.00 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 5 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $51.31 $17.15 $68.46 Top 10% +80% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR GROUP 6 (CLARK, COWLITZ, KLICKKITAT, PACIFIC, SKAMANIA, AND WAHKIAKUM COUNTIES POWER RQUIPMENT OPERATORS: ZONE 1) $48.09 $17.15 $65.24 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW $62.85 $27.57 $90.42 Top 10% +138% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW $62.39 $27.57 $89.96 Above median +136% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TOW $61.83 $27.57 $89.40 Bottom 10% +135% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1A: CRANES: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM; DRILLING MACHINE; OVERHEAD, BRIDGE TYPE: 100 TONS AND OVER; TO $61.56 $27.57 $89.13 Top 10% +134% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO $63.75 $27.57 $91.32 Top 10% +140% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO $63.29 $27.57 $90.86 Above median +139% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES: 200 TONS- 299 TONS, OR 250? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES: FRICTION CRANES THROUGH 199 TO $62.73 $27.57 $90.30 Bottom 10% +137% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW $64.66 $27.57 $92.23 Top 10% +142% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW $64.19 $27.57 $91.76 Above median +141% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES: 300 TONS AND OVER OR 300? OF BOOM INCLUDING JIB WITH ATTACHMENTS; CRANES FRICTION: 200 TONS AND OVER; TOW $63.62 $27.57 $91.19 Bottom 10% +140% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE $60.02 $27.57 $87.59 Top 10% +130% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES: THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE $59.49 $27.57 $87.06 Bottom 10% +129% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND $60.46 $27.57 $88.03 Top 10% +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND $55.68 $27.57 $83.25 Bottom 10% +119% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4: ASSISTANT ENGINEER; BOBCAT; BROOMS; COMPRESSOR; CONCRETE FINISH MACHINE: LASER SCREED; CRANES, A-FRAME: 10 TONS AND $55.43 $27.57 $83.00 Top 10% +118% vs market $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40 MILES FROM THE RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MIL $34.42 $17.63 $52.05 Top 10% $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 2: MORE THAN 30 MILES BUT LESS THAN 40 MILES FROM THE RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MIL $33.24 $17.63 $50.87 Bottom 10% $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILES FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MIL $44.21 $17.28 $61.49 Top 10% $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILESE FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MI $47.09 $20.31 $67.40 Top 10% $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 3: MORE THAN 40 MILES BUT LESS THAN 50 MILESE FROM THE RESPECTIVE CITY HALL. ZONE 4: MORE THAN 50 MILES BUT LESS THAN 80 MI $46.13 $20.31 $66.44 Bottom 10% $0.00 $0.00 $0.00 $0.00
RESPECTIVE CITY HALL. ZONE 5: MORE THAN 80 MILES FROM THE RESPECTIVE CITY HALL $48.05 $20.31 $68.36 Top 10% $0.00 $0.00 $0.00 $0.00
SHIPPING & RECEIVING); WRECKER AND TOW TRUCK. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, LEWISTON. ZONE 1: 0-45 RADI $39.58 $20.93 $60.51 Top 10% $0.00 $0.00 $0.00 $0.00
SHIPPING & RECEIVING); WRECKER AND TOW TRUCK.. ZONE DIFFERENTIALS-ADD TO ZONE 1 RATE. ZONE 2: +$2.00. BASE POINTS: SPOKANE, LEWISTON. ZONE 1: 0-45 RAD $36.58 $20.93 $57.51 Top 10% $0.00 $0.00 $0.00 $0.00
TONS; CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE; CONVEYORS; DOZERS: D-9 & UNDER; DRILL OILERS: AUGER TYPE, TRUCK O $59.23 $27.57 $86.80 Top 10% $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 1: GROUP 1- ESCORT DRIVER OR PILOT CAR; EMPLOYEE HAUL; POWER BOAT HAULING EMPLOYEES OR MATERIAL. ZONE DIFFERENTIALS-ADD TO ZONE 1 $36.83 $20.93 $57.76 Top 10% +88% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 1: GROUP 2- FISH TRUCK; FLAT BED TRUCK; FORK LIFT; LEVERPERSON; TRAILER MOUNTED HYDRO SEEDER AND MULCHER; SEEDER & MULCHER; STATIO $39.47 $20.93 $60.40 Top 10% +97% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 1: GROUP 4- A-FRAME; BURNER, CUTTER, & WELDER; SERVICE GREASER; TRUCKS, SIDE, END, BOTTOM & ARTIFULCATED END DUMP; TRUCK MOUNTED H $39.91 $20.93 $60.84 Top 10% +98% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 1: GROUP 6- FLAHERTY SPREADER BOX DRIVER; FLOWBOYS; FORK LIFT; DUMPS; MECHANIC; SEMI-END DUMPS; TRANSFER TRUCK & TRAILER; TRANSIT $40.22 $20.93 $61.15 Top 10% +99% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 1: GROUP 7- OIL DISTRIBUTOR DRIVER; STRINGER TRUCK; TRANSIT MIXERS & TRUCKS HAULING CONCRETE; TRUCK, SIDE, END, BOTTOM END DUMP; T $40.56 $20.93 $61.49 Top 10% +101% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 2: GROUP 2- FISH TRUCK; FLAT BED TRUCK; FORK LIFT; LEVERPERSON; TRAILER MOUNTED HYDRO SEEDER AND MULCHER; SEEDER & MULCHER; STATIO $36.47 $20.93 $57.40 Top 10% +87% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 2: GROUP 4- A-FRAME; BURNER, CUTTER, & WELDER; SERVICE GREASER; TRUCKS, SIDE, END, BOTTOM & ARTIFULCATED END DUMP; TRUCK MOUNTED H $36.91 $20.93 $57.84 Top 10% +89% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVERS: AREA 2: GROUP 6- FLAHERTY SPREADER BOX DRIVER; FLOWBOYS; FORK LIFT; DUMPS; MECHANIC; SEMI-END DUMPS; TRANSFER TRUCK & TRAILER; TRANSIT $37.22 $20.93 $58.15 Top 10% +90% vs market $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $53.99 $17.05 $71.04 Top 10% $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $52.31 $17.01 $69.32 Above median $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $50.38 $16.96 $67.34 Above median $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $40.88 $16.72 $57.60 Above median $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $36.07 $15.79 $51.86 $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $51.52 $16.99 $68.51 Above median $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $39.89 $16.70 $56.59 $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $39.26 $16.68 $55.94 $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $38.40 $16.66 $55.06 $0.00 $0.00 $0.00 $0.00
WENATCHEE, AND YAKIMA ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 RADIUS MILES FROM THE RESPECTIVE CITY $31.19 $16.48 $47.67 Bottom 10% $0.00 $0.00 $0.00 $0.00
YAKIMA COUNTIES) $45.36 $23.40 $68.76 Top 10% $0.00 $0.00 $0.00 $0.00
YAKIMA COUNTIES) $42.31 $23.40 $65.71 Above median $0.00 $0.00 $0.00 $0.00
YAKIMA COUNTIES) $41.56 $23.40 $64.96 Bottom 10% $0.00 $0.00 $0.00 $0.00
ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO $54.98 $27.52 $82.50 Above median $0.00 $0.00 $0.00 $0.00
ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO $46.81 $27.52 $74.33 Bottom 10% $0.00 $0.00 $0.00 $0.00
ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO $51.78 $27.52 $79.30 $0.00 $0.00 $0.00 $0.00
ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO $54.59 $27.52 $82.11 Above median $0.00 $0.00 $0.00 $0.00
ZONE B: ADD $0.70 PER HOUR TO ZONE A RATES. ZONE C: ADD $1.00 PER HOUR TO ZONE A RATES. *ZONE PAY WILL BE CALCULATED FROM THE CITY CENTER OF THE FOLLO $55.43 $27.52 $82.95 Top 10% $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Columbia, WA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Columbia

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260001-16968-hwy →