Heavy Construction — Adams, Washington

WD WA20260043-16965-hvy · Revision 2 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER in Adams, Washington (construction type: heavy) is $44.21/hr base + $17.28/hr fringe = $61.49/hr total package (WD WA20260043-16965-hvy, Rev. 2).

Scroll down for all 25 trade classifications covered by this determination.

WD Number: WA20260043-16965-hvy
Revision: 2
Construction Type: heavy
State: Washington (WA)
County: Adams
Effective: May 17, 2026
Trades covered: 25
Official source: SAM.gov reference WA20260043View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER $44.21 $17.28 $61.49 Above median +75% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $17.21 $0.00 $17.21 -50% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $49.55 $19.09 $68.64 Above median +48% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER $43.40 $32.77 $76.17 Above median +49% vs market $0.00 $0.00 $0.00 $0.00
LABORER, MASON TENDER BRICK $38.05 $16.75 $54.80 Above median +99% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 1 FLAGGER $37.03 $16.90 $53.93 +96% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 10 GRADE CHECKER $43.21 $16.90 $60.11 +118% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER $40.13 $16.90 $57.03 +107% vs market $0.00 $0.00 $0.00 $0.00
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS $40.46 $16.90 $57.36 +108% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $14.67 $0.00 $14.67 Above median -47% vs market $0.00 $0.00 $0.00 $0.00
LINE CONSTRUCTION: LINEMEN $60.54 $24.88 $85.42 Bottom 10% +41% vs market $0.00 $0.00 $0.00 $0.00
MILLWRIGHT $61.62 $20.43 $82.05 Above median +124% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $28.15 $8.20 $36.35 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $36.26 $17.01 $53.27 Above median +89% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER $25.98 $3.98 $29.96 -21% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT $41.56 $23.40 $64.96 Top 10% +71% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER $42.31 $23.40 $65.71 Top 10% +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS; OILER $42.51 $23.40 $65.91 +73% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE; TRACKHOE/EXCAVATOR; CRANES; BOOM TRUCK $42.71 $23.40 $66.11 +74% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE; TRACKHOE/EXCAVATOR; CRANES, BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR; MECHANIC $43.05 $23.40 $66.45 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE; TRACKHOE/EXCAVATOR; CRANES; LOADERS; GRADER/BLADE $43.39 $23.40 $66.79 +75% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES; LOADERS $45.36 $23.40 $68.76 +81% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 10 YARD TRUCK $24.61 $8.34 $32.95 Top 10% +7% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.67 $0.00 $19.67 Above median -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: WATER TRUCK $24.36 $8.30 $32.66 Above median +7% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Adams, WA — Heavy construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Adams

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for WA20260043-16965-hvy →