Highway Construction — Suffolk*, Virginia

WD VA20260195-16874-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Suffolk*, Virginia (construction type: highway) is $20.21/hr base + $0.00/hr fringe = $20.21/hr total package (WD VA20260195-16874-hwy, Rev. 1).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: VA20260195-16874-hwy
Revision: 1
Construction Type: highway
State: Virginia (VA)
County: Suffolk*
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference VA20260195View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $20.21 $0.00 $20.21 Above median -16% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $16.03 $0.00 $16.03 -31% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION $36.85 $14.13 $50.98 Top 10% +72% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $24.03 $0.00 $24.03 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $27.38 $0.00 $27.38 -2% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $18.62 $2.62 $21.24 Above median +10% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $14.85 $0.00 $14.85 Above median -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: GRADE CHECKER $14.88 $0.00 $14.88 -23% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $17.76 $0.00 $17.76 Above median -8% vs market $0.00 $0.00 $0.00 $0.00
LABORER: POWER TOOL OPERATOR $15.69 $0.00 $15.69 -19% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR $19.09 $1.81 $20.90 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.74 $0.00 $20.74 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $19.16 $4.45 $23.61 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $17.40 $2.01 $19.41 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER, INCLUDING UTILITY $19.43 $0.00 $19.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $24.42 $4.69 $29.11 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: DRILL $24.66 $0.00 $24.66 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADALL $19.26 $0.00 $19.26 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE $23.21 $0.00 $23.21 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: HYDROSEEDER $16.64 $0.00 $16.64 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $17.86 $0.00 $17.86 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $21.43 $0.00 $21.43 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $23.12 $3.60 $26.72 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $20.12 $3.81 $23.93 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PILEDRIVER $21.83 $4.08 $25.91 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $21.32 $0.00 $21.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: SCREED $22.13 $4.89 $27.02 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.89 $0.00 $12.89 Above median $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER : HEAVY 7CY & UNDER $15.53 $0.00 $15.53 Above median -41% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: 1/SINGLE AXLE TRUCK $18.26 $4.88 $23.14 Top 10% -12% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: FUEL AND LUBRICANT SERVICE $18.25 $0.00 $18.25 Top 10% -30% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HEAVY OVER 7 CY $16.98 $0.00 $16.98 Above median -35% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: MULTI AXLE $18.77 $4.63 $23.40 Top 10% -11% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Suffolk*, VA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Suffolk*

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260195-16874-hwy →