Building Construction — Rappahannock, Virginia

WD VA20260174-15419-bld · Revision 3 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA in Rappahannock, Virginia (construction type: building) is $40.77/hr base + $20.17/hr fringe = $60.94/hr total package (WD VA20260174-15419-bld, Rev. 3).

Scroll down for all 33 trade classifications covered by this determination.

WD Number: VA20260174-15419-bld
Revision: 3
Construction Type: building
State: Virginia (VA)
County: Rappahannock
Effective: May 17, 2026
Trades covered: 33
Official source: SAM.gov reference VA20260174View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL A. PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DA $40.77 $20.17 $60.94 Top 10% +186% vs market $0.00 $0.00 $0.00 $0.00
BOILERMAKER $38.97 $27.39 $66.36 +128% vs market $0.00 $0.00 $0.00 $0.00
BRICK POINTER/CAULKER/CLEANER $19.68 $0.00 $19.68 Bottom 10% $0.00 $0.00 $0.00 $0.00
BRICKLAYER $38.80 $15.17 $53.97 +102% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK $23.89 $5.23 $29.12 Top 10% +21% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $21.94 $3.36 $25.30 +8% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $29.16 $11.86 $41.02 Above median $0.00 $0.00 $0.00 $0.00
ELECTRICIAN $59.50 $23.06 $82.56 Top 10% +179% vs market $0.00 $0.00 $0.00 $0.00
FIRESTOPPER INCLUDES THE APPLICATION OF MATERIALS OR DEVICES WITHIN OR AROUND PENETRATIONS AND OPENINGS IN ALL RATED WALL OR FLOOR ASSEMBLIES, IN ORDE $30.21 $10.43 $40.64 Top 10% $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: SOFT FLOORS $18.75 $0.00 $18.75 Above median -18% vs market $0.00 $0.00 $0.00 $0.00
GLAZIER $32.41 $14.46 $46.87 +67% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL AND STRUCTURAL $37.86 $25.86 $63.72 Above median +128% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $25.85 $6.94 $32.79 Above median +17% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING $15.03 $2.90 $17.93 Above median -7% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.81 $4.26 $21.07 Above median +9% vs market $0.00 $0.00 $0.00 $0.00
MASON - STONE $45.65 $21.21 $66.86 Above median +140% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $23.50 $4.50 $28.00 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $18.95 $4.03 $22.98 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $21.99 $4.98 $26.97 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $31.68 $2.64 $34.32 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: FORKLIFT $21.56 $7.57 $29.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $22.26 $3.57 $25.83 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $16.25 $4.88 $21.13 Above median $0.00 $0.00 $0.00 $0.00
PAINTER: BRUSH, ROLLER AND SPRAY $29.16 $11.86 $41.02 Top 10% +91% vs market $0.00 $0.00 $0.00 $0.00
PIPEFITTER: INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL D $55.00 $24.46 $79.46 Top 10% +177% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY AND $53.30 $23.71 $77.01 +169% vs market $0.00 $0.00 $0.00 $0.00
ROOFER $15.83 $3.06 $18.89 -20% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER: INCLUDES HVAC DUCT INSTALLATION A.PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LA $53.42 $23.20 $76.62 +172% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $45.22 $27.69 $72.91 Above median +155% vs market $0.00 $0.00 $0.00 $0.00
TILE FINISHER $23.40 $0.00 $23.40 +17% vs market $0.00 $0.00 $0.00 $0.00
TILE SETTER $27.80 $10.25 $38.05 +91% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $19.22 $2.58 $21.80 Above median -17% vs market $0.00 $0.00 $0.00 $0.00
WATERPROOFER $21.75 $1.57 $23.32 Above median $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Rappahannock, VA — Building construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.