Residential Construction — Portsmouth*, Virginia

WD VA20260142-16872-res · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for BRICKLAYER in Portsmouth*, Virginia (construction type: residential) is $18.89/hr base + $0.00/hr fringe = $18.89/hr total package (WD VA20260142-16872-res, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: VA20260142-16872-res
Revision: 1
Construction Type: residential
State: Virginia (VA)
County: Portsmouth*
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference VA20260142View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
BRICKLAYER $18.89 $0.00 $18.89 -29% vs market $0.00 $0.00 $0.00 $0.00
CARPENTER $14.07 $0.00 $14.07 -42% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $15.53 $0.00 $15.53 -33% vs market $0.00 $0.00 $0.00 $0.00
DRYWALL FINISHER/TAPER $14.00 $0.00 $14.00 $0.00 $0.00 $0.00 $0.00
DRYWALL HANGER AND METAL STUD INSTALLER $13.79 $0.00 $13.79 Bottom 10% -45% vs market $0.00 $0.00 $0.00 $0.00
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING $15.75 $0.00 $15.75 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
FLOOR LAYER: CARPET $17.42 $0.00 $17.42 -24% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, ORNAMENTAL $15.59 $0.00 $15.59 Bottom 10% -44% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, STRUCTURAL $21.55 $1.39 $22.94 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $10.48 $0.00 $10.48 -46% vs market $0.00 $0.00 $0.00 $0.00
LABORER: LANDSCAPE $11.70 $0.00 $11.70 -39% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - BRICK $13.69 $0.00 $13.69 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: MASON TENDER - CEMENT/CONCRETE $12.62 $0.00 $12.62 -35% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $14.04 $2.66 $16.70 Above median -14% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $16.31 $4.46 $20.77 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER $15.26 $0.80 $16.06 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $15.17 $2.27 $17.44 $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $15.21 $2.77 $17.98 Above median $0.00 $0.00 $0.00 $0.00
PAINTER $10.97 $0.00 $10.97 -49% vs market $0.00 $0.00 $0.00 $0.00
PLUMBER $16.60 $0.00 $16.60 -42% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $39.99 $18.05 $58.04 Above median +131% vs market $0.00 $0.00 $0.00 $0.00
POWER EQUIPMENT OPERATOR $40.99 $18.05 $59.04 Above median +135% vs market $0.00 $0.00 $0.00 $0.00
RATE FOR ALL HOURS WORKED $52.06 $38.44 $90.50 Top 10% $0.00 $0.00 $0.00 $0.00
ROOFER $11.75 $0.00 $11.75 -50% vs market $0.00 $0.00 $0.00 $0.00
SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION $14.94 $0.00 $14.94 Bottom 10% -47% vs market $0.00 $0.00 $0.00 $0.00
SPRINKLER FITTER $17.78 $0.00 $17.78 Bottom 10% -38% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: DUMP TRUCK $16.30 $0.00 $16.30 -38% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Portsmouth*, VA — Residential construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Portsmouth*

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260142-16872-res →