Highway Construction — Norton*, Virginia

WD VA20260093-14787-hwy · Revision 1 · Effective May 17, 2026

Revision history →
Quick Answer

The Davis-Bacon prevailing wage for CARPENTER, INCLUDES FORM WORK in Norton*, Virginia (construction type: highway) is $16.52/hr base + $0.00/hr fringe = $16.52/hr total package (WD VA20260093-14787-hwy, Rev. 1).

Scroll down for all 27 trade classifications covered by this determination.

WD Number: VA20260093-14787-hwy
Revision: 1
Construction Type: highway
State: Virginia (VA)
County: Norton*
Effective: May 17, 2026
Trades covered: 27
Official source: SAM.gov reference VA20260093View on SAM.gov →

Prevailing Wage Rates — All Trades

Base hourly rates and fringe benefit requirements for all trade classifications covered by this wage determination. Total package = base + fringe.

Trade Classification Base $/hr Fringe $/hr Total Package H&W Pension Vacation Training
CARPENTER, INCLUDES FORM WORK $16.52 $0.00 $16.52 -32% vs market $0.00 $0.00 $0.00 $0.00
CEMENT MASON/CONCRETE FINISHER $19.35 $0.00 $19.35 -17% vs market $0.00 $0.00 $0.00 $0.00
IRONWORKER, REINFORCING $20.80 $0.00 $20.80 -26% vs market $0.00 $0.00 $0.00 $0.00
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR $15.90 $0.00 $15.90 -18% vs market $0.00 $0.00 $0.00 $0.00
LABORER: COMMON OR GENERAL $13.81 $0.00 $13.81 Above median -29% vs market $0.00 $0.00 $0.00 $0.00
LABORER: PIPELAYER $16.75 $0.00 $16.75 Above median -13% vs market $0.00 $0.00 $0.00 $0.00
OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR $15.95 $0.00 $15.95 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE $20.53 $0.00 $20.53 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: BROOM/SWEEPER $12.25 $0.23 $12.48 $0.00 $0.00 $0.00 $0.00
OPERATOR: BULLDOZER $19.36 $0.00 $19.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: CRANE $26.68 $0.00 $26.68 $0.00 $0.00 $0.00 $0.00
OPERATOR: GRADER/BLADE, INCLUDES FINISHING $26.13 $0.00 $26.13 Top 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: LOADER $19.36 $0.00 $19.36 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: MECHANIC $18.57 $0.00 $18.57 $0.00 $0.00 $0.00 $0.00
OPERATOR: MILLING MACHINE $21.13 $0.00 $21.13 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT PLANER $17.28 $0.00 $17.28 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVEMENT PLANER GROUNDSMEN $14.81 $0.29 $15.10 Bottom 10% $0.00 $0.00 $0.00 $0.00
OPERATOR: PAVER $16.80 $0.00 $16.80 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.17 $0.00 $15.17 $0.00 $0.00 $0.00 $0.00
OPERATOR: ROLLER $15.85 $0.00 $15.85 Above median $0.00 $0.00 $0.00 $0.00
OPERATOR: TRACTOR $12.25 $0.23 $12.48 $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING OPERATOR $19.40 $0.00 $19.40 Bottom 10% $0.00 $0.00 $0.00 $0.00
PAVEMENT MARKING TRUCK DRIVER $19.00 $0.00 $19.00 Above median $0.00 $0.00 $0.00 $0.00
TRAFFIC CONTROL: FLAGGER $12.09 $0.00 $12.09 $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER : HEAVY 7CY & UNDER $16.69 $0.00 $16.69 Top 10% -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: HEAVY OVER 7 CY $16.69 $0.00 $16.69 -36% vs market $0.00 $0.00 $0.00 $0.00
TRUCK DRIVER: SINGLE & MULTI AXLE $15.65 $0.00 $15.65 Bottom 10% -40% vs market $0.00 $0.00 $0.00 $0.00

Crew Labor Cost Estimator

Estimate total federal-contract labor cost using the Norton*, VA — Highway construction prevailing wage rates. Add a row for each trade in your crew, set the number of workers and hours, and optionally add a burden percentage for payroll taxes, workers’ comp, and insurance.

Trade Workers Hours/worker Rate $/hr Subtotal
|
Direct labor subtotal
$0.00
Loaded cost (with burden)
$0.00

This is an estimate only. Burden percentages vary widely by state, employer experience modifier, and benefit plan structure. Davis-Bacon also requires per-trade record-keeping on Form WH-347; this calculator does not replace certified payroll reporting.

Other Construction Types in Norton*

Compliance Notes

Full Davis-Bacon compliance guide →

View full revision history for VA20260093-14787-hwy →